Long Canyon Water Enhancement Project
Project ID: 4147
Status: Completed
Fiscal Year: 2018
Submitted By: 60
Project Manager: Kendall Bagley
PM Agency: Utah Division of Wildlife Resources
PM Office: Southern Region
Lead: Utah Division of Wildlife Resources
WRI Region: Southern
Description:
This project will consist of piping water from and existing pipeline in John Williams Canyon to Long Canyon. We will also set three additional troughs along this pipeline project that will benefit livestock and wildlife within the Oak Creek Wildlife Management Unit.
Location:
Project will take place on Forest Service Property located on the east side of the Oak Creek Wildlife Management Unit. Project is located within T 17 South R 3 West Sec. 27, 28, and 34 also T 18 South R 3 West Sec. 10 and 18.
Project Need
Need For Project:
This project is working with the Fillmore Forest Service and the West Bench Grazing Association to help distribute water through a pipeline to watering facilities within the Long Canyon and John Williams Allotment. The need for this project is to increase livestock distribution among the allotment, improve watering source for livestock and wildlife in the area. With recent fires like the Clay Springs Fire several watering facilities and pipelines have been damaged or in need of repair, loss of woody vegetation has allowed additional water to become abundant allowing spring to begin to flow and more water is available at certain times of year. This project will consist of installing three (3) new water trough within this project, along with installing approximately 4.5 miles of 1.5" SR-11 HDPE pipeline, to distribute enough suitable water to the allotment that will benefit both wildlife and domestic cattle.
Objectives:
This project will provide additional water to livestock grazing allotment along with providing year round water source for wildlife species such as mule deer, elk, turkeys, chuckers and other small game mammals on the Oak Creek Wildlife Management Unit. This project will partner with the UDWR, West Bench Grazing Association, and Fillmore Forest Service to accomplish this task. Objective are to distribute additional water sources within the allotment allowing cattle to utilize the allotment more efficient. This project will also allow water to be piped from John Williams Canyon and follow an existing pipeline to the Long Canyon trough. This project will allow for additional water at critical times of year for wildlife species to utilize during the year. Water will remain in the troughs after livestock has been moved to different allotments.
Project Location/Timing Justification (Why Here? Why Now?):
Threats to this project will consist of additional loss of water that can be utilized in this area, allowing for no water to be stored for wildlife species and livestock grazing within the allotment. Increased maintenance on the watering facilities and pipelines by the grazing association, allow for additional time and effort, loss of forage value in specific areas of the allotment due to over grazing, not distributing the cattle effectively enough can increase noxious weed species. By implementing and installing this pipeline, we can reduce the risk of overgrazing this allotment, improve water quality and quantity for wildlife and livestock for better rangeland health and overall management.
Relation To Management Plan:
The pinyon-juniper and big sagebrush areas lie within the Lowland Sagebrush Steppe Habitat type which is one of the key habitats identified in the 2015 WAP. The proposed projects will address some of the habitat management strategies outlined in the deer and elk management plans for herd unit 21 (Fillmore Oak Creek Unit ) including: *Continue to improve and restore sagebrush steppe habitats critical to deer according to DWRs Habitat Initiative. *Maintain habitat quantity and quality at a level adequate to support the stated population objectives while at the same time not resulting in an overall downward trend in range condition and watershed quality. *Work cooperatively with land management agencies and private landowners to plan and implement improvement projects for the purpose of enhancing wildlife habitat and range resources in general. *The project also helps fulfill the state mule deer management plan section IV Habitat Goal: Conserve and improve mule deer habitat throughout the state with emphasis on crucial ranges. *The proposed projects will address the following goals and objectives of the Division of Wildlife Resources most recent strategic management plan: *Resource Goal: expand wildlife populations and conserve sensitive species by protecting and improving wildlife habitat. *Objective 1: protect existing wildlife habitat and improve 500,000 acres of critical habitats and watersheds throughout the state. *Objective 3: conserve sensitive species to prevent them from becoming listed as threatened or endangered. *Constituency Goal: Achieve broad-based support for Division programs and budgets by demonstrating the value of wildlife to all citizens of Utah. *Objective 2: improve communication with wildlife organizations, public officials, private landowners, and government agencies to obtain support for Division programs. *UDWR SR critical big game winter range are important browse communities that need to be enhanced and improved. The Division will employ a variety of methods to achieve this including prescribed grazing, prescribed burning, reseeding and seedling transplants, also mechanical treatments. Priority areas will include sagebrush-steppe and mountain browse communities. Falls within the rangeland focus area for WRI wildlife species for mule deer and elk. Utah Wildlife Action Plan, 2015 Publication Number 15-14, State of Utah, Department of Natural Resources, Division of Wildlife Resources, Effective 2015-2025 -- Promoting and funding restoration that reduces the uncharacteristic and surpluses of older age class, including: Dixie/chain harrow, brush mowing or other treatments that reduce the older age class and stimulate the younger/mid age classes; herbicide or mechanical treatments single tree mulching/cutting of invading conifer. Utah Division of Wildlife Resources Statewide Management Plan for Mule deer. Section IV Statewide management goals and objectives. This plan will address Habitat Objective 2: Improve the quality and quantity of vegetation for mule deer on a minimum of 500,000 acres of crucial range by 2013 (p11-12). Strategy C. Initiate broad scale vegetative treatment projects to improve mule deer habitat with emphasis on drought or fire damaged sagebrush winter ranges, ranges that are being taken over by invasive annual grass species, and ranges being diminished by encroachment of conifers into sagebrush or aspen habitats. Strategy f. Encourage land managers to manage portions of pinion-juniper woodlands and aspen/conifer forests in early successional stages. Fillmore Pahvant Deer Herd Management Plan Unit #21 (2015) - Habitat Management Objectives -- Encourage vegetation manipulation projects and seeding to increase the availability, abundance, and nutritional content of browse, grass, and forb species. Strategies: Habitat Protection, Improvement and Maintenance - Reduce expansion of Pinyon-Juniper woodlands into sagebrush habitats and improve habitats dominated by Pinyon-Juniper woodlands by completing habitat restoration projects like lop & scatter, bullhog and chaining projects; maintain summer fawning areas by increasing beneficial habitat work in summer and transitional habitat areas.(p3-4) Utah Wild Turkey Management Plan Newly treated areas through fire or mechanical means will attract use by wild turkey which are abundant on Oak Creek Management Unit. Insects and new growth will be readily available to support turkey populations, also the availability of more water in the John Williams and Long Canyon areas. UDWR Wildlife Action Plan This project is geared toward meeting the goals found within this plan for a variety of wildlife species from large to small. The entire proposed project area is found within a UWRI conservation focus area. *This plan is consistent with the Fishlake National Forest Plan for wildlife habitat enhancement and fuels management to improve habitat, reduce fuel loading, and protect against catastrophic wildfire. *Other project have been completed by the Forest Service and UDWR in past years within the Long Canyon HUC 12 area. *Project within the are also benefit the management plans objectives of the lower Sevier River Watershed, as this will reduced sediment run off and create a healthy rangeland communities. *Management Plans are also in conjunction with NRCS overall goals of healthy rangelands and communities, improving watersheds and reducing erosion and sediment. The Natural Resources Conservation Service provides leadership in a partnership effort to help people conserve, maintain, and improve our natural resources and environment *FFSL CWPP Process is a local Community Wildfire Protection Plan (CWPP) is a collaborative plan created by the fire department, state and local forestry, land managers, community leaders, and the public.The planning process maps values at risk, and requires actions to reduce risk, such as prescribed burning, fuel reduction, or other measures that adapt a community to better confront their wildfire threat. Area is also part of the Millard RWPP FFSL Plan which was implemented in 2014, there are Wildfire Codes and Ordinances associated with this plan. Project would also be relevant to NCS Goals and supported through the FS National Cohesive Strategies. CAT FIRE Objectives and Strategies: In 2013, the State of Utah developed the Catastrophic Wildfire Reduction Strategy (CAT FIRE) in response to the severe 2012 fire season. Reducing the catastrophic wildfire requires attention to three interdependent goals identified in the National Cohesive Wildfire Management Strategy -- Restore and Maintain Landscapes, Fire Adapted Communities, and Wildfire Response. These goals have been embraced throughout the development of the state's CAT FIRE strategy. Mitigation of hazardous fuels can change fire behavior making it easier to suppress. The effects of the mitigation, however, are not limited to life and property safety but will also affect forest health, water quality, vegetative species abundance, etc. As we continue to implement projects across the landscapes in Utah, the only way to truly be successful is to integrate existing programs, utilize local and federal partners and continue to educate the general public to create the desired shift towards more resilient communities and ecosystems.
Fire / Fuels:
Fire or fuels loading will not be a factor with this project, pipeline will be buried under ground, and not be effected buy a wildfire, although the chance of a fire could burn the watering troughs or cause damage to them of one does occur. Watering troughs will be made of galvanized metal may with stand the intense heat of a wild land fire in this area. Also this winter the Fillmore Forest Service will be implementing a fuels reduction project in the Long Canyon area. This treatment will reduce encroaching pinyon-juniper trees by over 500 acres, allowing for reduction of fuels and the safeguarding against a catastrophic wildlife in the area.
Water Quality/Quantity:
This project will improve water quality and quantity due to the fact that we will be collecting water through a spring development or constructed head box and delivering it overland through a pipe line will prove to be more efficient than allowing the water to not be captured and disbursed on site, collecting sediment, debris and lose water due to evaporation. The quality of the water will be improved as it will be held in water troughs that will allow cattle and wildlife to drink clean clear water verse allowing water to be lost or made unavailable in a damaged seep. Water Right is held by the Fillmore Forest Service, approval has been granted to complete this project. Water Right #XXXXX, UDWR project manager will consult with Eric Anderson on the this project before implementation can take place and coordinate with the Fillmore Forest Service Office.
Compliance:
Compliance of this project will be from the Fillmore Forest Service providing the details of the installation of the pipeline and the setting of the trough, Project Manager will consult with UDWR Archaeologist to conduce survey if needed within this project. Pipeline is scheduled to follow an existing pipeline and may not need NEPA or ESA clearances.
Methods:
This project will be implemented with the help of the Fillmore Forest Service, UDWR, and West Bench Grazing Association to establish a pipeline to carry water from an existing pipeline that is located in John Williams Canyon. This pipeline will feed three watering troughs all within the Forest Service Property and the Long Canyon Allotment. This will be done by the use of a D-8 Cat to carry the spools of pipe, pipe will be installed below the surface and ripped in with the dozer. This project will be installed within the Long Canyon Allotment, the UDWR and West Bench Grazing Association will contract with a company that has experience working with this type of pipe and is set up with the proper equipment to have it installed. Permittees will help install the pipeline and watering troughs along with working along side the contractor to make sure the project runs smoothly. Fillmore Forest Service has looked at this project and is in favor of helping out the permittee to address the need of distributing water within the allotment. UDWR is also in favor as additional watering locations will benefit wildlife populations of mule deer, elk, and wild turkeys within the Oak Creek WMU.
Monitoring:
Monitoring of this project will be done by the Fillmore Forest Service, and the West Bench Grazing Permittees, they will be able to inspect the pipeline, and the watering troughs to make sure all connections are tight and working properly. Also the permittees will be assigned to monitor the collection box or spring development and remove any sediment that may effect the pipeline, water will be turn off in the fall allowing for the pipeline to drain and not freeze. Grazing Permittee, and the Forest Service will also monitor the livestock distribution as it pertains to the grazing allotment moving cattle when needed to allow for grass, forbs and shrubs to not be over utilized. UDWR will also monitor the need to keep the troughs clean and free from debris and small mammals along with allowing access for wildlife and cattle to the watering location.
Partners:
Partners for this project will consist of UDWR, UGIP, Fillmore Forest Service and the West Bench Grazing Association, along with vested Sportsman Groups. We have been successful in working with them to implement good projects within this allotment in the past few years, additional support has been leveraged through great partnerships looking for projects that will provide benefits to the local community, that protect the livestock grazing and wildlife within Millard County. Great efforts and strides have been made by Sportsman Organizations to improve the overall goals and objectives to increase and sustain wildlife through these types of projects.
Future Management:
Management of this project will be to ensure that the project is installed correctly, pipeline and watering troughs are set correct and all fittings are secure. The need to fix or repair items associated with this project will be left up to the West Bench Grazing Permittees in the future, they along with the Fillmore Forest Service and will be working together to improve this allotment and improve the distribution of cattle during the grazing period for both the Fillmore Forest Service and the West Bench Grazing Permittees. Additional phases of this project may be considered as water is limited in this area and the need for additional watering sites is critical to the distribution of livestock as well as wildlife in this area.
Sustainable Uses of Natural Resources:
This project will be a great asset to help benefit the livestock portion of the project, by increasing the need for water in critical areas of this allotment it will be able to increase the overall utilization of the allotment as far as grazing additional areas that have not been grazed, reducing impacts of grazing on other areas. Water is critical within the allotment improved water will allow for longer use of the allotment time during drought situations, and in the fall of the year when water source have run dry, additional storage through the water trough will allow the livestock to maintain body weights and allow for better weighing weights for the producer due to traveling to different areas to water. Expansion of the water troughs increasing them in size will allow for additional storage, easy to water larger groups of cattle at once. The pipeline portion just allows better distribution of water decreasing the cost to the permittee of hauling water by truck to different locations.
Budget WRI/DWR Other Budget Total In-Kind Grand Total
$19,900.00 $21,297.50 $41,197.50 $13,500.00 $54,697.50
Item Description WRI Other In-Kind Year
Materials and Supplies Expenses to purchase three (3) new Backwoods Troughs, all troughs will be 4' x 8'. $2,400.00 $2,297.50 $0.00 2018
Other In-kind services that will be from the West Bench Grazing Association, in the form of labor, equipment and fuel to help install the pipeline and the three troughs. $0.00 $0.00 $7,500.00 2018
Personal Services (permanent employee) In-kind services from UDWR employee to help with the install, work with contracting of the pipeline and flag the pipeline locations and trough locations. Along with Monson Shaver t conduct the Culture Resources inventory with help from the Fillmore FS. $0.00 $0.00 $3,500.00 2018
Materials and Supplies Expenses to purchase HDPE pipe for this project estimate 4.1 miles (21,475') of pipe to be installed. Will include Pipeline materials and labor to install with contractor. $17,500.00 $19,000.00 $0.00 2018
Other In-kind labor and materials from the Fillmore Forest Service Office towards the project. $0.00 $0.00 $2,500.00 2018
Funding WRI/DWR Other Funding Total In-Kind Grand Total
$20,233.36 $21,297.50 $41,530.86 $13,500.00 $55,030.86
Source Phase Description Amount Other In-Kind Year
Private In-kind Labor, fuel and equipment coming from the West Bench Grazing Association. $0.00 $0.00 $7,500.00 2018
Utah Division of Wildlife Resources (UDWR) In-kind from UDWR Employee's $0.00 $0.00 $3,500.00 2018
Utah Wild Sheep Foundation NS6522 $5,000.00 $0.00 $0.00 2018
United States Forest Service (USFS) In-kind Services from the Fillmore Forest Service towards this project, in the form of pipe and or troughs $0.00 $0.00 $2,500.00 2018
UDAF-Grazing Improvement Fund (GIP) UGIP will be applying for funding towards this project through the Grazing Board. $0.00 $21,297.50 $0.00 2018
Safari Club International NS6526 $4,900.00 $0.00 $0.00 2018
Sportsman for Fish & Wildlife (SFW) NS6527 $10,000.00 $0.00 $0.00 2018
Habitat Council Account HCRF $333.36 $0.00 $0.00 2018
Species
Species "N" Rank HIG/F Rank
Chukar R3
Threat Impact
Droughts High
Chukar R3
Threat Impact
Spring Development / Capping Low
Chukar R3
Threat Impact
Water Developments for Livestock Low
Domestic Livestock
Threat Impact
No Threat NA
Elk R2
Threat Impact
Droughts Low
Elk R2
Threat Impact
Improper Grazing – Livestock (current) Low
Elk R2
Threat Impact
Invasive Plant Species – Non-native Low
Wild Turkey R1
Threat Impact
Droughts Medium
Wild Turkey R1
Threat Impact
Improper Grazing – Livestock (current) Low
Wild Turkey R1
Threat Impact
Spring Development / Capping Low
Mourning Dove R2
Threat Impact
Droughts Medium
Mourning Dove R2
Threat Impact
Spring Development / Capping Low
Mule Deer R1
Threat Impact
Droughts Medium
Mule Deer R1
Threat Impact
Improper Grazing – Livestock (current) Low
Mule Deer R1
Threat Impact
Inappropriate Fire Frequency and Intensity High
Mule Deer R1
Threat Impact
Invasive Plant Species – Non-native High
Habitats
Habitat
Project Comments
Comment 01/18/2017 Type: 1 Commenter: Keith Day
Kendall, Will there be any natural water sources available after this project is completed, or will it all be piped? Are the troughs going to be suitable for use by birds and bats? I presume the troughs will have exit ramps. One of the threats you list to mourning doves is capping springs. How will this project, which appears to cap springs, ameliaorate that threat?
Comment 01/19/2017 Type: 1 Commenter: Kendall Bagley
Keith, we will be connecting on to the existing pipeline that is below the natural spring location in John Williams Canyon, we will have over flows on each trough that will allow for open water at ground level through the over flow. The troughs will be approx. 4' x 8' and will have escape ramps installed for birds and small mammals. There will be access to water after the cattle have left the allotments, this is one this I emphasized with the permittee. Thanks, Keith
Comment 08/21/2018 Type: 2 Commenter: Alison Whittaker
Kendall - Will you make individual features for your troughs please? Also it looks like you used a little bit of seed on the pipeline. You don't need to map it but it is worth mentioning in the completion report. Thanks.
Completion
Start Date:
05/30/2018
End Date:
06/04/2018
FY Implemented:
2018
Final Methods:
Final methods on this project was to work with a contractor that was hired by the West Bench Grazing Association to install 2" HDPE pipeline in the ground from John Williams Canyon to Long Canyon. This project was a maintenance project to redo an existing pipeline, within the Fillmore Forest Service Allotment. In addition to the pipeline three new water troughs where place along the pipeline to hold storage for cattle and wildlife in the area.
Project Narrative:
This project was a great collaboration between Grazing Associations, Fillmore Forest Service, UGIP and UDWR along with Sportsman Groups. We worked together to install 21,750 feet of 2" HDPE Pipe and set three new trough on the east bench of the Oak Creek Wildlife Management Unit. The Grazing Association hired a contractor to install the pipeline, Jed Heaton (ThirstyCows.com) was the contractor he has a tracked cat that has a pivoting ripper with a boot that installs the pipe underground. Pipeline was installed next to an older existing line, UDWR was able to use the services of Monson Shaver to conduct all Culture Resource surveys and work with the Forest Service and the Permittees to make sure all necessary information was current before installation. After all the troughs have been set and the pipeline installed in the fall of 2018 we will reseed portions of the pipeline by the use of a ATV seeder, this will allow grass and forbs to become established along the pipeline corridor and is in agreement with what the Forest Service and the UDWR agreed upon. The troughs are in place and water system is working well, great project and partnerships continue to be built to implement projects like these in the future.
Future Management:
Future Management of this project will be based on the West Bench Grazing Association working and repairing leaks, loose fittings etc. if necessary to keep the pipeline in good working condition. This will also involve the permittees to work closely with the Range Conservationist on the Fillmore Forest Service allowing for water to be stored and distributed as cattle are move from one allotment to the other. Water troughs will be turned off and on by the permittee, leaving enough water within the troughs for wildlife use on the Oak Creek Management Unit.
Map Features
ID Feature Category Action Treatement/Type
714 Pipeline Construction Below surface
1720 Water development point feature Construction Trough
1721 Water development point feature Construction Trough
1722 Water development point feature Construction Trough