West Jordan Big Bend Urban Fishery
Project ID: 4594
Status: Completed
Fiscal Year: 2019
Submitted By: 174
Project Manager: Eric McCulley
PM Agency: Utah Reclamation Mitigation and Conservation Commission
PM Office: Salt Lake City
Lead: Other
WRI Region: Central
Description:
The West Jordan Big Bend Urban Fishery project is part of a larger effort to enhance the recreation and habitat on a 70 acre property along the Jordan River in West Jordan City. A wide range of partners including the Utah Division of Wildlife Resources have worked with the City to develop plans for a 4-6 acre urban fishery, which will provide access to fishing for residents and visitors in Salt Lake County and the surrounding region.
Location:
The urban fishery is proposed for an natural open space west of the Jordan River at approximately 8600 South and 900 West in West Jordan City.
Project Need
Need For Project:
With the Big Bend Restoration Project, the City of West Jordan will improve the habitat conditions and recreation features on 70 acres of aquatic, riparian, wetland and upland habitat and natural open space. The project site is located along the 50-mile Jordan River, whose corridor is almost entirely bordered by developed and urbanized areas. Recreational open space and quality riparian and wetland habitat area are at a premium along the degraded Jordan River and this project will improve these resources at the Big Bend. Restoring a naturally functioning channel and associated riparian corridor and wetlands will improve habitat and water quality and reduce erosion. Numerous studies have identified the need for improved water quality, additional riparian and wetland habitat and additional outdoor recreation opportunities in the Jordan River corridor and the City of West Jordan. In 2013, Utah Department of Environmental Quality issued a Total Maximum Daily Load (TMDL) for Jordan River, identifying temperature, total organic matter and dissolved oxygen as pollutants and parameters of concern. The site was the subject of a Section 206 Aquatic Ecosystem Restoration Study Report in 2003. Commenting on the current conditions of the site, the author concluded that "This reach of the river was significantly realigned in the 1950s to accommodate the Sharon Steel [Superfund] Site. Agricultural development, urban encroachment, and general human modification have resulted in significant degradation of the natural river ecosystem. Flood management activities and other modifications have greatly impacted the natural mechanics of the Jordan River and decreased its stability. Furthermore, as a result of this channel instability, remaining riparian, wetland, shaded riverine aquatic (SRA) and upland habitat is being lost." A draft Environmental Assessment prepared by the USACE for the site in the late 2000's stated "Historically, the project site was dominated by willow stands, cottonwoods, and species native to the area. These native species contributed to a diversity of habitat types and provided important functions in the river's ecosystem. As a result of channelization, the wetland and riparian vegetation along the Jordan River continues to deteriorate. The Russian olive has taken the place of Fremont's Cottonwood as the dominant over story species and Kentucky Bluegrass has out-competed many of the native grasses. In the floodplain, the native woody component has been removed and replaced with introduced grasses for pastureland. Currently, most of the site is composed of non-native species. Russian olive (Elaeagnus angustifolia) and tamarisk (Tamarix chinensis) have invaded large portions of the entire Jordan River corridor." See attached images for photos of the current site conditions. Note the prevalence of Russian olive and the lack of vegetation diversity. The City of West Jordan (City), Salt Lake County, the National Park Service (NPS) and other local and regional agencies has identified the site as a prime location for recreational and educational opportunities. No less than six studies have highlighted the site's potential as a recreational hub, reconnecting the community to the Jordan River. These studies and report include the Jordan River Natural Corridor Report (2000), the West Jordan City Parks, Recreation and Trails Master Plan (2006), Blueprint Jordan River (2008), the Salt Lake County Jordan River Trail Master Plan (2008) the West Jordan City Parks, Recreation, Trails, and Open Space Handbook (2012) and the West Jordan City Comprehensive General Plan (2012). In a 2014 fact sheet, the NPS said that once completed "the Big Bend Restoration Project will become one of the 'gems' of the Jordan River Parkway trail system". As a testament to the importance of the project, the City of West Jordan has assembled a stakeholders group of 18 federal, state and local agencies that meet quarterly to discuss the project and continue it progression towards successful completion. The City of West Jordan City Council has unanimously endorsed the project and have pledged to support its continued development and construction. The complete project, including the recreational facilities and Jordan River channel realignment is a huge effort with a substantial amount of collaboration needed. The City was awarded $60,000 WRI FY17 funding for Phase 3 of the project. This amount was matched by $145,500 in funds from other grants and in-kind donations. For FY19 the City is requesting $125,000 in Habitat Council funding, which will be matched by $572,000 in funding and in-kind work from other sources. The budget includes construction of the urban fishing pond. The trail system, associated recreational facilities, and other aquatic and riparian habitat features will be implemented in subsequent years. The project is located across from the Sharon Steel settlement site which was part of a 1990's Superfund clean-up effort. When completed, the Big Bend Restoration Project will be the largest wildlife and bird habitat restoration project along the Jordan River. The property was acquired by the City of West Jordan (27 acres) and the Utah Reclamation and Mitigation Conservation Commission (URMCC) (43 acres) for habitat restoration including a river meander following it's alteration by the Sharon Steel slag pile which is now capped and cannot be removed from the river's edge. Construction following completion of the design will be funded in part with $753,000 committed by the USFWS from the Sharon Steel Settlement funds ($200,000 of which will be used to install the irrigation system). The City will own the property and maintain facilities constructed, treat and monitor weeds, and work with UDWR on an agreement to manage the urban fishery. The request for funding to UDWR is due to planning and construction funding being permanently cut in 2011 by the U.S. Army Corp of Engineers who had the project lead over the past several years, drafted an environmental assessment, obtained cultural clearance, and had produced concepts plans in hopes of providing construction funding. The City is excited to have the property acquired, environmental assessment near completion, and to have a 90% conceptual design completed, allowing the City to expend the Sharon Steel damage settlement.
Objectives:
The objectives of this phase of the project are to install the urban fishing pond and irrigation system for the preserved habitat areas, which are central to the overall West Jordan Big Bend Project. The specific objectives for implementation of the urban fishery include working with a contractor to remove materials in order to create an approximately 15 foot deep pond and rough grade the areas around the pond. Future phases of the project will be focused on installation of specific aquatic habitat and recreation features in and around the pond.
Project Location/Timing Justification (Why Here? Why Now?):
The urban fishery will address the impacts of drought and increased temperatures on the fish species in the pond. The consistent source of water passing through the pond will ensure that emergent marshes and open water, which are rare in this area of the valley, will be reduced. The deep water proposed for the pond (15'+) will provide cooler water for fish species. Additionally, shading from extensive tree canopy around the pond will offset potential increases in temperature from sun shining on shallow open water. Limited areas of shallow water are proposed. The project will also benefit aquatic forests and scrub/shrub habitat by providing irrigation to areas that were historically closer to the groundwater table, but groundwater connection has been reduced due to downcutting of the Jordan River. Noxious weed encroachment and historical habitat loss for wildlife along the Jordan River corridor. Noxious weeds are the dominant vegetation on the current proposed project area (including Scotch Thistle, Dalmatian Toadflax, White top, Russian olive, and tamarisk), and if not contained, will continue to spread into nearby residential areas, as well as downstream, due to seed dispersal, etc. Two years ago, the Department of Interior, Restoration Support Unit completed a noxious weed survey for the 70 acre project area and a Noxious Weed Management Plan was developed in 2015 (see attached). Spraying and other appropriate removal of noxious weeds will be completed this year and next by URMCC on their 43 acres in an effort to reduce the amount of weeds in the years prior to initiating the major habitat improvements. The Jordan River Commission is currently funding some planting of riparian plants and control on invasive plants through the Large Grant Program grant to over the next two years on West Jordan City's 27 acres. The restoration project will incorporate a long term noxious weed treatment plan (refer to monitoring methods). The Department of Interior through the America's Great Outdoor Initiative committed two years of in-kind staff time from the Restoration Support Unit, USFWS, and NPS. Other partners like the Jordan River Commission have also committed two years of in-kind support and resources. The City is striving to have the restoration design completed while there is strong support by stakeholders within two years. This would allow the City to then begin using Sharon Steel Natural Resource Damage Settlement funding for design and construction of the major river realignment (Phase 4).
Relation To Management Plan:
Utah Division of Wildlife Resources Draft Community Fisheries Strategy. The West Jordan Big Bend Urban Fishery will address many of the objectives identified by the UDWR in their strategy for community fisheries. These objectives include creating community fisheries that are accessible to citizens through multiple modes of transportation including human powered and regular automobiles. This pond will be accessible by walking or biking along the Jordan River Parkway, floating on a boat on the Jordan River, automobiles, and public transportation. It is centrally located in the Salt Lake Valley and will draw from around the region. Additionally, multiple recreation opportunities will be available at the pond including the opportunity for access to the Jordan River for fishing or boating, biking north or south along the Parkway, and access to other cultural attractions in West Jordan and Sandy Cities. US Army Corps of Engineers (USACE) - West Jordan Section 206 Aquatic Ecosystem Restoration Draft Environmental Assessment (2010) Goals /objectives of the USACE study: 1) Restoring lowland riparian habitat; 2) The restoration provides an opportunity to restore the degraded ecosystem structure, function, and dynamic processes of the river; 3) Restoring both aquatic and terrestrial ecosystem functions could improve both aquatic and terrestrial habitat over what presently occurs on-site; 4) Increased the number and diversity of aquatic invertebrates and improved water quality. The current project used the work accomplished in the study as a beginning point for the alternatives analysis and the 30 percent design. From a habitat restoration perspective, the goal and objectives of the current project are identical to those identified by the USACE. -- Utah DEQ -- Jordan River TMDL (2013) Utah Department of Environmental Quality has issued a Total Maximum Daily Load (TMDL) for Jordan River, identifying total organic matter and dissolved oxygen as pollutants and parameters of concern. UDEQ has set a goal of reducing Total Organic Matter (OM) to 3,983 kg/day, which will achieve the target Dissolved Oxygen (DO) of 5.5 mg/L. The project addresses these goals in three general areas. 1) The project will stabilize banks in the project reach, reducing the amount of sediment, including organic topsoil that enters the Jordan River. 2) The project will also include the planting of cottonwoods, willows and other trees that will add shade over the river's surface. 3) The realigned reach will include small drops and riffles, which increase turbulence in the flow. All of these improvements will contribute to the increase of dissolved oxygen in the Jordan River. -- West Jordan City Trail Action Plan (2012) Goals /objectives of the Trail Action Plan: 1) Includes a timeline showing the partners involved since 1991 and identifies settlement funding; 2) Identifies the restoration project adjacent to the trail; 3) Includes a listing of the restoration plans; 4) A goal stated in the plan is, "Create an aesthetic, native, and healthy plant community through restoration and establishment of a natural area." The Restoration Project will directly achieve the goals of the Trail Action Plan by providing habitat and recreational opportunities with easy access from the Jordan River Parkway Trail. Primary and secondary trail planned as part of the project will extend the City's trail system and provide opportunities for less formal/soft surface trails. Big Bend Restoration Environmental Assessment (EA) (2013 and ongoing): Utah Reclamation Mitigation Conservation Commission (URMCC) developed an EA in 2013 as part of the Jordan River Parkway Trail design and construction. Goals /objectives identified by the EA: 1) Restore channel geomorphology, native riparian and wetland habitat, and improve wildlife habitat, 2) Improve water quality by running water through wetland complexes, 3)Reduce risk of flooding due to improved channel capacity, and 4) Restore an estimated 10,000 linear feet of shaded river aquatic habitat. Now that the 30 percent design has been completed for the Restoration Project, URMCC is developing an EA for the redevelopment of the site, including the habitat enhancement and recreational components. The core stakeholder group includes URMCC staff and they have providing guidance and feedback as the design progresses. The Restoration Project meets all of the defined goals, including channel and habitat improvements and enhancements, water quality improvements, flood conveyance improvements and restoration of shad aquatic habitat. -- West Jordan Parks, Recreation, Trails, and Open Space Handbook (2012) The goals/objectives of the Handbook: 1) Identifies lands Environmental and Recreational uses; 2) Open land gives permanent protection to natural resources and environmentally sensitive lands including wetlands and wildlife habitats; 3) Restore City open space for the ecological benefit of wildlife and native plant species; and 4) Connect corridors in and around the community that have been legally and permanently preserved to provide for recreation as well as wildlife corridors. The restoration project addresses these goals directly, providing a 70 acre open space sanctuary in the City of West Jordan that includes recreational components such as an urban fishery and treail -- Blueprint Jordan River (2008) Goals /objectives: 1) Restore the river channel and buffers to improve and protect water quality, enhance hydrologic function, and to support vegetation, wildlife, and habitat, 2) Integrate storm water treatment into open lands to naturally filter water runoff, 3) Enhance fish habitat, and 4) Promote the river as a quality-of-life amenity and recreational destination by creating urban fisheries. Habitat restoration, particularly aquatic, wetland and riparian habitat is a primary goal of the project, including 11.1 acres of new wetland habitat and 4.2 acres of new riverine habitat. -- Jordan River Natural Corridor Report (2000) Goals/objectives of the Corridor Report: 1) Provides recommendations for natural conservation corridors specially naming the restoration project; 2) Addresses restoration to "ensure proper grading and stream bed elevation and supplemental irrigation to allow successful habitat restoration away from the immediate riverbank"; 3) Provides a physical and biological assessment; 4) Addresses improving water quality by restoring the river profile to reduce erosion. Habitat restoration, particularly aquatic, wetland and riparian habitat is a primary goal of the project, including 11.1 acres of new wetland habitat and 4.2 acres of new riverine habitat. Water quality in the Jordan River will be improved by: 1) Stabilizing banks in the project reach, reducing the amount of sediment, including organic topsoil that enters the Jordan River. 2) Planting of cottonwoods, willows and other trees that will add shade over the river's surface. 3) Grading of the realigned reach will include small drops and riffles, which increase turbulence in the flow. All of these improvements will contribute to the decrease of sediment input into the river and the increase of dissolved oxygen. -- Sharon Steel Damage Settlement Restoration Plan (1997) Goals/objectives of the Sharon Steel Damage Settlement Restoration Plan: 1) Restoring, replacing, and enhancing natural functioning habitats for migratory birds and other wildlife, 2) Addresses settlement funds to provide maximum benefits for resources damaged, 3) Identifies migratory birds and endangered species and their habitat and outlines restoration of their habitat, and 4) Addresses restoring, enhancing, and replacing natural function. The project team has been working closely with Tracy Aviary to ensure that the project's habitat restoration components meet the needs of migratory song birds and other wildlife species . A total of 40+ acres of habitat improvements are proposed, 16+ acres of which will be isolated from the general public.
Fire / Fuels:
Removal of dry tamarisk and Phragmites will reduce the fire hazard in an area which includes a mature cottonwood grove. In 2016, a fire burned several acres of the adjacent lands around the Rocky Mountain Power Substation to the south. Luckily, the fire did not jump into the Big Bend Restoration Project site. Utah Conservation Corps Crews reduced the ladder fuels in the cottonwood grove, which were comprised of dry and decadent tamarisk. Some of the other funding sources being sought for this grant are to improve the riparian understory with native, firewise plants in the areas treated in 2016.
Water Quality/Quantity:
The project will improve water quantity in this reach of the Jordan River in two ways: 1) The project will acquire approximately 2 cfs of year round flow from the adjacent North Jordan Irrigation Canal to maintain the urban fishery and revegetation of the site. A portion of this water will make its way to the Jordan River after being used on the site through either groundwater input or surface flow from the pond overflow. This will increase flows in the Jordan River, particularly needed during the summer months. 2) The next phase of the project (Phase 4) is proposed to realign the main channel of the Jordan River. The existing main channel of the river will be maintained as a side channel for habitat. The addition of the channel through the site significantly increases the amount of conveyance available during a flood event. As a result, 100-year water surface elevations in the Jordan River through the project reach and upstream of the 9000 South bridge are lowered. See the attached 30 percent plans for more detail about this realignment. The overall phased project will improve water quality in this reach of the Jordan River in a number of ways: 1) Stabilizing banks of the Jordan River in the project reach will reduce the amount of fine sediment, including organic topsoil that enters the Jordan River. This will reduce turbidity, reduce the impact of fine sediment of aquatic species and increase dissolved oxygen through reduction of organic matter in the water. See the attached photo of the heavily eroded banks of the Jordan River surrounding the project. Many of the banks will be rebuilt and replanted. See attached sample cross sections that show bank stabilization plans. 2) The project proposes to plant cottonwoods, willows and other trees that will add shade over the river's surface. This will reduce water temperatures, increasing dissolved oxygen. 3) Grading of the realigned reach will size the channel appropriately to provide sufficient depths and velocities to prevent stagnation and deposition of fine sediment transporting through the reach. It will include small drops and riffles, which increases turbulence in the flow. All of these improvements will increase dissolved oxygen levels in the main channel of the Jordan River. All of these changes will also improve the in-channel habitat along this reach of the Jordan River. It currently is fairly poor habitat, with steep/high banks, uniform flow characteristics and limited bar/thalweg formation. --
Compliance:
The Utah Reclamation, Mitigation, and Conservation Commission (partial land owner) has nearly completed the Environmental Assessment for the entire phased project and a Notice of Intent will be published in early 2018. No significant issues are expected due to the extensive outreach that has occurred over the last several years about the project. While no wetlands or existing aquatic resources are located at the pond excavation area, other aspects of the project along the Jordan River will be permitted through the Utah Water Rights, U.S. Army Corps of Engineers Joint Permit application system. The pond will require ground disturbance and dewatering permits from the City and County and a stormwater pollution prevention plan will be developed as part of the excavation plan.
Methods:
The pond will be dug using heavy equipment such as large excavators and dump trucks that will stockpile some materials on site, while other materials with good construction properties will be removed from the site and used for other construction projects. In order to remove all the materials needed, the area will be dewatered using large pumps, which will push water to existing settling ponds in other parts of the project area.
Monitoring:
The Utah Water Watch (Utah State University) has established a set of cross sections on the Jordan River at the site of the proposed pond outfall to show changes in the channel cross section of the Jordan River. Vegetation transects to monitor the effects of noxious weed control and native plant revegetation have been established across the site. Additionally, Tracy Aviary has established a set of 8 variable radius bird point counts across the 70 acres and monitors those approximately monthly. Baseline conditions across the site have been collected from 2014-2017. We are also working with the Utah Division of Water Quality to develop a sampling and analysis plan to track water quality improvement from the project.
Partners:
Partners include: West Jordan, Midvale, Sandy, USFWS, National Park Service RTCA, US Department of the Interior Restoration Support Unit, Environmental Protection Agency, North Jordan Irrigation Company, Salt Lake County, Jordan River Commission, Rocky Mountain Power, Utah Reclamation Mitigation and Conservation Commission, Tracy Aviary, University of Utah, Utah Division of Wildlife Resources (UDWR), Utah Governor Office of Planning and Budget, Utah Division of Water Quality, and Utah Forestry Fire and State Lands. Individuals from many of these organizations are part of the project's stakeholder group. The stakeholders provide guidance on the design and implementation of the project including detailed review of plans, reports and other documentation. The stakeholder group meets several times of year at a meeting hosted by the City of West Jordan to review project development progress and provide feedback/technical expertise. The City has presented the project at West Jordan City Council on three occasions to update the City decision makers and their staff. The meetings also providing the general public an opportunity to review the project's details and progress and provide comments.
Future Management:
Property currently owned by URMCC (43 acres) will be deeded to the City following habitat restoration and will be managed by West Jordan City into perpetuity. This has been URMCC's mandate since the property was acquired several years ago. The City has the desire to create an iconic area along the Jordan River. They will determine what facilities to include in the restoration based on input at stakeholder meetings, along with construction and maintenance costs. The City will maintain all facilities and educational components constructed. Management of the urban fishery will be completed through an agreement with UDWR.
Sustainable Uses of Natural Resources:
There will be no domestic livestock benefit.
Budget WRI/DWR Other Budget Total In-Kind Grand Total
$125,000.00 $340,000.00 $465,000.00 $14,000.00 $479,000.00
Item Description WRI Other In-Kind Year
Personal Services (permanent employee) USFWS, URMCC, West Jordan, Tracy Aviary in-kind services for administration and monitoring. $0.00 $0.00 $14,000.00 2019
Contractual Services Funds will be used to contract a heavy equipment company to excavate the pond and dispose of the materials either on site or off site. $125,000.00 $310,000.00 $0.00 2019
Contractual Services Design for bank stabilization $0.00 $30,000.00 $0.00 2019
Funding WRI/DWR Other Funding Total In-Kind Grand Total
$125,000.00 $340,000.00 $465,000.00 $14,000.00 $479,000.00
Source Phase Description Amount Other In-Kind Year
Habitat Council Account HCRF $125,000.00 $0.00 $0.00 2019
West Jordan City For pond rough grading $0.00 $60,000.00 $4,000.00 2019
Salt Lake County Proposed Tourism, Recreation, Cultural and Convention funding request included in Salt Lake County budget. $0.00 $250,000.00 $0.00 2019
Central Utah Project (CUP) Continued staffing support from URMCC, which is one of the primary land owners. $0.00 $0.00 $4,000.00 2019
Tracy Aviary Citizen Science Monitoring of birds on the project. $0.00 $0.00 $2,400.00 2019
U.S. Fish and Wildlife Service (USFWS) The Sharon Steel Natural Resource Damage Assessment funds contract set up and administration. $0.00 $0.00 $3,600.00 2019
FFSL Watershed Bank Stabilization design funding from UFFSL $0.00 $30,000.00 $0.00 2019
Species
Species "N" Rank HIG/F Rank
Bluegill R3
Threat Impact
Droughts Very High
Brown Trout R2
Threat Impact
Increasing stream temperatures High
Rainbow Trout R5
Threat Impact
Increasing stream temperatures High
White Bass R3
Threat Impact
Sediment Transport Imbalance High
White-faced Ibis N4
Threat Impact
Housing and Urban Areas Medium
Habitats
Habitat
Aquatic-Forested
Threat Impact
Channel Downcutting (indirect, unintentional) High
Aquatic-Forested
Threat Impact
Channelization / Bank Alteration (direct, intentional) High
Aquatic-Forested
Threat Impact
Invasive Plant Species – Non-native Medium
Aquatic-Scrub/Shrub
Threat Impact
Channel Downcutting (indirect, unintentional) High
Aquatic-Scrub/Shrub
Threat Impact
Invasive Plant Species – Non-native Medium
Emergent
Threat Impact
Droughts High
Open Water
Threat Impact
Droughts High
Project Comments
Comment 03/05/2018 Type: 2 Commenter: Monson Shaver
Previous cultural inventory "West Jordan 206 Aquatic Ecosystem" 11-UF0450. No sites.
Completion
Start Date:
07/02/2018
End Date:
06/28/2019
FY Implemented:
2019
Final Methods:
The pond rough grading was completed through use of heavy equipment including excavators, loaders, and dump trucks. The contractor moved approximately 60,000 cubic yards of material and stockpiled topsoil, clay, and gravel for use in final implementation of pond features. See photos in "images/documents - during" section of the database.
Project Narrative:
The West Jordan Big Bend Urban Fishery project broke ground in the spring of 2019 after many years of planning. West Jordan City conducted a contractor procurement process after completing the construction designs for the 4.6 acre urban fishery. Redoubt Restoration was hired to implement the earth work. Upon completion of the rough grading of the pond the disturbance area was stabilized in order to allow West Jordan City the time to develop the implementation plans for the final grading and filling of the pond, which is proposed to be mostly completed in FY 2020.
Future Management:
West Jordan City has hired 2 AmeriCorps Individual Placements in their parks department to manage noxious weeds and assist with site reclamation as construction continues. The City is currently working on the finalization plans for the urban fishery with plans to complete major construction and fill the pond with water in early 2020.
Map Features
ID Feature Category Action Treatement/Type
6834 Aquatic/Riparian Treatment Area Lake/Wetland/Pond Improvements Pond Construction