Last Chance Sage Grouse and Wildlife Habitat Improvement--Phase 1
Project ID: 4843
Status: Completed
Fiscal Year: 2020
Submitted By: 154
Project Manager: Kreig Rasmussen
PM Agency: U.S. Forest Service
PM Office: Richfield Ranger District
Lead: U.S. Forest Service
WRI Region: Southern
Description:
Due to the on going loss of active springs and seeps in the Last Chance-Clear Creek areas there is a need to supplement water for wildlife. The entire project design is to enhance water needs for a variety of wildlife by installing 6 guzzler systems across the proposed project area to facilitate upland game and big game. Sage grouse populations are documented to exist just south of the project boundary. Adding guzzlers combined with vegetation treatments will enhance habitat for wildlife.
Location:
All proposed treatments are on Forest System Lands and in Sevier County, Utah. The analysis area, where management activities are proposed, is the Fremont River and Richfield RD's of the Fishlake National Forest, adjacent to highway 72 in the Last Chance drainage on the east side of Hilgard Mountain. The project area lies entirely within National Forest System lands, in Wayne and Sevier Counties in all or portions of T24S, R3-4E; T25S, R4-5E; and T26S, R4E of the Salt Lake Base Meridian.
Project Need
Need For Project:
Phase 1 of a watershed size project. Various species of conifer are experiencing an advanced growth rate in the Last Chance and Clear Creek watersheds. Due to advanced encroachment of conifer in sage brush, open meadows, aspen stands, and spruce stands; a loss of sage brush, grass/forb meadows are decreasing at an accelerated rate. We digitized aerial photos of the area from 1939 and compared the image to current vegetative conditions. We then mapped the acres of conifer increase across the different eco-types to and were able to visualize the change or encroachment that has occurred since 1939. This dramatic increase has had an affect on ecosystem balance in these watersheds. Advanced conifer encroachment in the watershed is having an affect on the overall water quality in the area. Treatments to remove or reduce the advancement of conifer across the elevation gradient in the watershed should improve more desirable vegetative characteristics for a variety of wildlife. Purpose The purpose of the project is to provide large open sagebrush landscapes essential to GRSG for breeding, nesting, brood rearing and winter use by implementing goals and objectives outline in the Fishlake LRMP and GRSG ROD to achieve the following goals: 1. To protect, enhance and restore sage-grouse and its habitat (GRSG ROD, page 12). 2. Identify and improve habitat for sensitive, threatened and endangered species including participation in recovery efforts for both plants and animals (LRMP, page IV-4). 3. Integrate vegetation management with resource management to maintain productivity and provide for diversity of plant an animal communities (LRMP, page IV-3). Need There is a need to conserve, enhance, and restore sage-grouse habitat in order to move toward desired conditions and avoid further impacts to the viability of existing and future sage-grouse populations. Also, conifer encroachment in adjacent stands are contributing to the degradation of sage-grouse habitat, thereby creating a need to improve ecosystem diversity and health to the watershed scale.
Objectives:
Install 4 big game guzzlers and 2 upland game guzzlers (Phase 1 current proposal). It is our desire that sage grouse will move over the summit and find the proposed vegetation treatments (Phase 2-future proposal) and the guzzlers attractive and expand their range. This Last Chance Wildlife Habitat Improvement Project is proposed for National Forest System (NFS) lands managed by the Fremont River and Richfield Ranger Districts of the Fishlake National Forest. The purpose of this project is to implement the Fishlake National Forest Land and Resource Management Plan (LRMP) by proposing vegetation treatments designed specifically to achieve the following goals: 1. Integrate vegetation management with resource management to maintain productivity and provide for diversity of plant and animal communities (Fishlake LRMP, page IV-3). 2. Coordinate wildlife and fish habitat management with State, other Federal and local agencies (Fishlake LRMP, page IV-3). 3. Identify and improve habitat for sensitive, threatened and endangered species including participation in recovery efforts for both plants and animals (Fishlake LMRP, page IV-4). The Fremont River and Richfield District Rangers, Fishlake National Forest, have made a preliminary assessment that this proposal falls within a category of actions listed in the Forest Service National Environmental Policy Act (NEPA) Handbook that are excluded from documentation in an Environmental Assessment (EA) or Environmental Impact Statement (EIS) and that no extraordinary circumstances exist that would preclude the use of these categories (FSH 19009.15 (Chapter30)). The proposed action is a routine activity as defined in FSH 1909.15 Section 32.2 and fits Category 6: "Timber stand and/or wildlife habitat improvement activities that do not include the use of herbicides or do not require more than 1 mile of low standard road construction." Next year we will propose a WRI proposal to start vegetation work within the project area. Treatment methods would consist of : (approximately 6,650 acres of hand treatment and approximately 1,804 acres of ground based mechanical treatment) would include cutting conifers (primarily pinyon pine and juniper) with handsaws or chainsaws, lopping with pruning shears and using tracked or wheeled machinery fitted with a grinding implement or shearing implement. Broadcast burning (approximately 3,886 acres) will also occur in areas of conifer encroachment (primarily subalpine fir mixed with aspen) adjacent to sagebrush steppe.
Project Location/Timing Justification (Why Here? Why Now?):
Phase 1 considerations: (Current proposal) Due to the lack of water in the area to benefit wildlife species we suppose a decline in certain populations will occur. Recent deer surveys in the area have shown a decline over historical population numbers. Without water needed to support wildlife, especially big game, a concern of wild ungulates concentrating to other adjacent areas that have water could become a problem. Phase 2 vegetation considerations (Future proposal): One of the greatest risk to this project's success is the possibility of cheat grass invasive species post treatment. This risk is somewhat elevation dependent on this project. The lowest elevations near valley floor pose the greatest risk. As treatments occur further up slope and/ or on northern slopes, the risk decreases. Seeding will occur on the project to promote grasses and forbs in the effort to out compete the cheat grass. Ungulate browse pressure also poses a risk/threat on project success. Multiple phases are planned to complete this landscape scale habitat improvement project. Neighboring projects to the south have been completed or are on deck to be treated to improve ecological conditions for wildlife with an emphasis on Greater Sage grouse. The project is predominately in phase 2 transitioning to phase 3. Some understory sage/ grasses/forbs still exists but is about to cross the threshold into phase 3 dominated PJ and lose the remaining understory. Ground surveys and site visits have allowed us to see the lack of understory plants in the pinion/juniper zone as well as the upland mixed-conifer aspen forest. Forage productivity has diminished greatly over the past century and the pinion/juniper encroachment continues on a yearly basis into the more productive sage/grass/forb communities. Some areas within the project have lost a majority of the understory sage/grasses/forbs, but other areas have not completely lost the understory. If left untreated the risk increases annually by loosing valuable understory vegetation. The threat is that all wildlife species will eventually suffer and could lean toward less diversity on the landscape. Catastrophic fire potential will continue to increase.
Relation To Management Plan:
This project will provide the opportunity to enhance or sustain viable wildlife populations in the Last Chance and upper Clear Creek watershed areas. Management plans that would be considered in association with this proposal would consist of: 1. Fishlake Land Resource Management Plan--The project falls within the guidelines for wildlife habitat improvement found within the LRMP. The area chosen to install the guzzlers is a managed as a wildlife emphasis area. Installation of 6 guzzlers across the landscape will restore water in the area enabling wildlife to utilize the diverse cover and forage found in the unique ecosystem. Relationship to the Forest Plan This action responds to the goals and objectives outlined in the Fishlake National Forest LRMP, as amended, and helps move the project area towards desired conditions. The proposed action is a project level analysis that is not intended to re-examine the basic land use allocations made in the LRMP, nor propose broad changes in land use allocations. Instead, planning at the project level involves the development, analysis, and disclosure of potential environmental impacts associated with the implementation of specific actions designed to achieve the overall goals and objectives of the LRMPs. The project area falls within the LRMP management areas (Figure 2) included in the following table: Table 1. Last Chance Wildlife Habitat Improvement Project LRMP Management Areas. Management Area and Acres 4B -- Habitat for Management Indicator Species 2,617 9F -- Improved Watershed 89 6B -- Intensive Livestock Management 9,634 2. UDWR Elk Management Plan. Habitat improvements such as water improvements in areas that have become water limited due to drought or climate change are encouraged by the statewide elk plan. Water sources developed across the landscape in the project area are necessary to maintain and improve wildlife population viability including upland game, small game, big game, avian groups, and insect populations. 3. UDWR Mule Deer Management Plan Habitat improvements such as water improvements in areas that have become water limited due to drought or climate change are encouraged by the statewide Mule Deer plan. 4.Utah Wildlife Action Plan. Installing guzzlers in areas needing water to facilitate wildlife needs is part of the WAP as well as the Fishlake LRMP. Phase 2 of the project will address more complex concerns found within the Utah WAP. Sage Grouse Management The Parker Mountain-Emery Sage Grouse Management Area is part of the project area. This project aligns with the Parker Mountain Greater Sage-grouse (Centrocercus urophasianus) Local Conservation Plan, October 1, 2006. Specifically, the project corresponds with section 2.5. in the plan, which states as follows: "Action: Treat areas where undesirable vegetation has become, or is at risk of becoming a factor in sage-grouse habitat loss or fragmentation." It also follows the Conservation Plan for Greater Sage-grouse in Utah, February 14, 2013. Specifically section 5.4.1: "Aggressively remove encroaching conifers and other plant species to expand greater sage-grouse habitat where possible." Bald Eagle Management Bald Eagles: Bald eagles are protected by the Utah Wildlife Code, the Migratory Bird Treaty Act, and the Bald and Golden Eagle Protection Act. Although the bald eagle is no longer listed on the Endangered Species List, the species remains listed as a Species of Concern in Utah, a subset of the State Sensitive Species List. State and federal laws prohibit harassing, injuring or killing eagles, or damaging their nests. Midwinter surveys of bald eagles within the lower 48 states were initiated by the National Wildlife Federation in 1979. Wintering Bald Eagles utilize the project area and treatments would improve life cycle opportunities for them. The Bald and Golden Eagle Protection Act (16 U.S.C. 668-668d) is a United States federal statute that protects two species of eagle. The bald eagle was chosen as a national emblem of the United States by the Continental Congress of 1782 and was given legal protection by the Bald Eagle Protection Act of 1940. This act was expanded to include the golden eagle in 1962.[1] Since the original Act, the Bald and Golden Eagle Protection Act has been amended several times. It currently prohibits anyone, without a permit issued by the Secretary of the Interior, from "taking" bald eagles. Taking is described to include their parts, nests, or eggs, molesting or disturbing the birds. The Act provides criminal penalties for persons who "take, possess, sell, purchase, barter, offer to sell, purchase or barter, transport, export or import, at any time or any manner, any bald eagle ... [or any golden eagle], alive or dead, or any part, nest, or egg thereof."[2] The purpose of the Bald and Golden Eagle Protection act is to not agitate the bald and golden eagle to the extent of not 1.) Abusing an eagle, 2.) Interfering with its substantial lifestyle, including shelter, breeding, feeding, or 3.) Nest abandonment.[3] The eagle feathers have been collected and incorporated into clothing, art, jewelry, etc. In addition, having the possession, exchange, or sale of bald eagle feathers violates the act if no permit is obtained. The basic structure of the act resembles the Migratory Bird Treaty Act.
Fire / Fuels:
Phase 2 of this project will provide the following burning opportunities:Broadcast burning (approximately 3,886 acres) would also occur in areas of conifer encroachment (primarily subalpine fir mixed with aspen) adjacent to sagebrush steppe. Burning would be done in mosaic patterns and burning would not target sagebrush areas. Seeding would occur as needed in treatment areas where a lack of existing understory and/or a high severity burn occurs. These areas proposed for burning would continue to be maintained with use of prescribed fire or as appropriate, allowing naturally caused ignitions to burn.
Water Quality/Quantity:
The Boss Tank Guzzler system will gather and store 1800 gallon of water when full. The tanks are sealed with a dome top to also gather rainwater and protect stored water from outside trash blowing into the tank. Future vegetation enhancement work will improve overall watershed ecological integrity. There is a need to conserve, enhance, and restore sage-grouse habitat in order to move toward desired conditions and avoid further impacts to the viability of existing and future sage-grouse populations. Also, conifer encroachment in adjacent stands are contributing to the degradation of sage-grouse habitat, thereby creating a need to improve ecosystem diversity and health to the watershed scale.
Compliance:
We have applied for and received a rain water gathering certificate required by Utah State Water Rights to gather and store water in quantities under 2500 gallon. This project is in compliance with the Fishlake National Forest LRMP as it directs habitat improvement for wildlife through vegetation management and structural improvements for water improvement.
Methods:
We intend to purchase a "Boss Tanks" brand wildlife guzzler kit. The kit includes a 22x100 foot apron that gathers rain water and/or snow. The water then passes through a filter and a 2" black plastic pipe into the catchment tank. The catchment tank is capable of holding 1800 gal. The tank is made of a cross-linked poly material that is UV resistant. The installation site is chosen by the local district wildlife biologist. After the materials are delivered to the installation site the area for the apron and tank are brushed to bare soil with a Bobcat and six-way blade. The apron site is prepared and the tank site is dug with a mini excavator. Plumbing connections are completed as well as back fill and compaction around the tank. The apron edges are back filled and the entire site is seeded where soil was disturbed. The entire area is fenced with a net wire/1-barb wire fence combination with a 30 ft. lodge pole game crossing section to facilitate movement in and out of the drinker area. Plans for vegetation treatments for upcoming years as separate phases is as follows: Proposed Action To move towards desired conditions and meet the purpose and need as described above we are proposing to reduce conifers that are encroaching into sage-grouse priority habitat, consistent with the Forest LRMP and GRSG ROD. Treatment methods (approximately 6,650 acres of hand treatment and approximately 1,804 acres of ground based mechanical treatment) would include cutting conifers (primarily pinyon pine and juniper) with handsaws or chainsaws, lopping with pruning shears, and using tracked or wheeled machinery fitted with a grinding implement (masticator) or shearing implement (large, powerful pruning shears). Material would be scattered and remain on site. Trees would be cut as close to the ground as practical. No live branches would remain on the stump. Within 1.86 miles of identified Lek locations, branches would be lopped from felled conifer and scattered below sagebrush height. Seeding would occur as needed in treatment areas where a lack of existing understory is present. As needed, these areas would continue to be maintained via hand and/or ground based mechanical equipment as described above. Broadcast burning (approximately 3,886 acres) would also occur in areas of conifer encroachment (primarily subalpine fir mixed with aspen) adjacent to sagebrush steppe. Burning would be done in mosaic patterns and burning would not target sagebrush areas. Seeding would occur as needed in treatment areas where a lack of existing understory and/or a high severity burn occurs. These areas proposed for burning would continue to be maintained with use of prescribed fire or as appropriate, allowing naturally caused ignitions to burn.
Monitoring:
The guzzlers in the project area will be outfitted with trail cameras. Cameras are placed at each site to detect wildlife species using the guzzler after it receives enough water to make it usable by wildlife. We also visit each one from time to time to monitor tracks around the drinker. We have used Dedicated Hunters to monitor and maintain our guzzlers and fences annually for issues that might affect the integrity of the guzzler project. Monitoring for Phase 2 would be an assessment of increased understory in the Pinion-Juniper treatment areas, conifer reduction and understory improvement in the uplands, wildlife use patterns in treatment areas, and AUM improvements for ungulates.
Partners:
We have had great success utilizing volunteer help from Dedicated Hunters as well as members of the Rocky Mountain Elk Foundation, The Mule Deer Foundation, and Sportsmen for Fish and Wildlife to install and maintain our other guzzlers on the forest. The sportsmen groups have been generous in the past to donate money for guzzler projects on the forest.
Future Management:
The Richfield Ranger District has installed 14 guzzlers in the last 5 years. We are constantly searching and learning where habitat improvements need to be made to enhance ecosystems to ensure healthy and viable wildlife populations. We will continue to look for opportunities to install guzzlers in areas where drought conditions and climate change have minimized water opportunities for wildlife. This project has plans for extensive vegetation management to improve habitat quality. Future Proposed Action-Phase 2 To move towards desired conditions and meet the purpose and need as described above we are proposing to reduce conifers that are encroaching into sage-grouse priority habitat, consistent with the Forest LRMP and GRSG ROD. Treatment methods (approximately 6,650 acres of hand treatment and approximately 1,804 acres of ground based mechanical treatment) would include cutting conifers (primarily pinyon pine and juniper) with handsaws or chainsaws, lopping with pruning shears, and using tracked or wheeled machinery fitted with a grinding implement (masticator) or shearing implement (large, powerful pruning shears). Material would be scattered and remain on site. Trees would be cut as close to the ground as practical. No live branches would remain on the stump. Within 1.86 miles of identified Lek locations, branches would be lopped from felled conifer and scattered below sagebrush height. Seeding would occur as needed in treatment areas where a lack of existing understory is present. As needed, these areas would continue to be maintained via hand and/or ground based mechanical equipment as described above. Broadcast burning (approximately 3,886 acres) would also occur in areas of conifer encroachment (primarily subalpine fir mixed with aspen) adjacent to sagebrush steppe. Burning would be done in mosaic patterns and burning would not target sagebrush areas. Seeding would occur as needed in treatment areas where a lack of existing understory and/or a high severity burn occurs. These areas proposed for burning would continue to be maintained with use of prescribed fire or as appropriate, allowing naturally caused ignitions to burn. Up to six wildlife guzzlers would also be installed; guzzlers would be designed for rainwater collection for large wildlife and upland game. Each guzzler site would be less than .5/acre footprint. See map for proposed treatment areas and proposed guzzler sites.
Sustainable Uses of Natural Resources:
As conifer encroachment accelerates on the low land and upland portions of the Last Chance-Clear Creek watershed areas water capacities are greatly diminished in the "natural setting" or desired condition. Wildlife and understory vegetation across the landscape have suffered for free water due to conifer encroachment at these different levels. Increase of PJ since the 1939 aerial photos have shown development and a transition of Phase 1 to Phase 2 PJ occur at a rapid rate. Vegetation projects at a large scale will improve watershed integrity for a variety of plants and animals. The addition in this Phase 1 request for guzzlers will add available drinking water for insects, avian species, rodents, small game, non-game, big game, and upland game. As vegetation projects move forward a dispersion of ungulate use will become widespread across the landscape allowing an overall improvement in health of this ecosystem. When all phases of this landscape scale project are complete opportunities will be plentiful for wildlife, livestock, recreation, camping, hunting, hiking, etc. Timber stand improvement will be realized within PJ-Spruce-Fir and Aspen forest types. Livestock operators will realize an increase in AUM values across the landscape thus improving grazing and watering opportunities for permitted cattle.
Budget WRI/DWR Other Budget Total In-Kind Grand Total
$46,468.00 $16,500.00 $62,968.00 $0.00 $62,968.00
Item Description WRI Other In-Kind Year
Materials and Supplies Fencing materials for 4 large wildlife guzzler sites @ $1000.00 each = $4,0000.00 and 2 small guzzler kits $500.00 each = $1000.00 $5,000.00 $4,000.00 $0.00 2020
Materials and Supplies Purchase of Boss Tank Wildlife Guzzler Kit-Large x 4 @ $8,500.00 each $34,000.00 $5,000.00 $0.00 2020
Equipment Rental/Use Mini-excavator rental for 2 weeks @ $1,000.00 a week = $2,000.00 $2,000.00 $2,000.00 $0.00 2020
Seed (GBRC) Seed for disturbed areas around guzzler installation sites. ($77.00/lb--85 lbs) $368.00 $1,000.00 $0.00 2020
Materials and Supplies Boss Tanks Bird Guzzler Kit @ $1800.00 each $3,600.00 $2,500.00 $0.00 2020
Materials and Supplies Equipment fuel and misc. plumbing supplies $500.00 $1,000.00 $0.00 2020
Archaeological Clearance Archaeological clearance for ground disturbance at 6 guzzler sites and reporting. $1,000.00 $1,000.00 $0.00 2020
Funding WRI/DWR Other Funding Total In-Kind Grand Total
$47,118.00 $16,500.00 $63,618.00 $11,200.00 $74,818.00
Source Phase Description Amount Other In-Kind Year
United States Forest Service (USFS) Mini-excavator operations $0.00 $2,000.00 $0.00 2020
Rocky Mountain Elk Foundation (RMEF) Volunteers from RMEF and UDWR Dedicated Hunters. 58 volunteers spent 8 hours each at $25.00/hr $0.00 $0.00 $11,200.00 2020
Federal Aid (PR) P651 $34,851.00 $0.00 $0.00 2020
United States Forest Service (USFS) Arch and Plant Surveys $0.00 $1,000.00 $0.00 2020
United States Forest Service (USFS) Materials and supplies including mobilization, fuel, plumbing supplies, additional fencing tools, added fencing costs, mobilization of equipment, transportation of fencing materials, travel to sites, fuel, etc. $0.00 $13,500.00 $0.00 2020
Habitat Council Account QHCR $12,267.00 $0.00 $0.00 2020
Species
Species "N" Rank HIG/F Rank
Bald Eagle N5
Threat Impact
Not Listed NA
Black Bear
Threat Impact
Not Listed NA
Black-tailed Jackrabbit
Threat Impact
No Threat NA
Bobcat
Threat Impact
No Threat NA
Cougar
Threat Impact
No Threat NA
Domestic Livestock
Threat Impact
No Threat NA
Elk R2
Threat Impact
Droughts Low
Greater Sage-grouse N3 R1
Threat Impact
Droughts Medium
Mule Deer R1
Threat Impact
Droughts Medium
Habitats
Habitat
Aspen-Conifer
Threat Impact
Droughts Medium
Mountain Sagebrush
Threat Impact
Droughts High
Mountain Shrub
Threat Impact
Inappropriate Fire Frequency and Intensity Low
Project Comments
Comment 01/24/2019 Type: 1 Commenter: Scott Chamberlain
Just wanted to say I am pleased with the size of the apron. Big is good.
Comment 02/14/2019 Type: 1 Commenter: Kreig Rasmussen
Thank you. This project has the potential to be a premier project that will benefit a variety of flora and fauna.
Comment 02/11/2019 Type: 1 Commenter: Keith Day
Kreig, I fail to see how bald eagle will benefit from installation of guzzlers. We have few, if any, bald eagles in that area during spring-summer and most wintering birds avoid the higher elevations and stick to valleys. What type of drinkers will be attached to the guzzlers? Will they be readily available to small mammals and birds? Will they require escape ramps? Keith
Comment 02/14/2019 Type: 1 Commenter: Kreig Rasmussen
I observe bald eagles arriving on the forest at the higher elevations about the third week in October. Our guzzlers we have installed are mostly on transition range and the ones for this project will be similar. Water for big game guzzlers and the smaller guzzlers should not be frozen until later in the month of October. Prey animals using the guzzlers and carrion from large game animal harvesting around the guzzlers should be a benefit for eagles, ravens, magpie's, etc. The large and small guzzlers are prefabricated with escape ramps and even the large guzzlers will allow small game, birds, insects the opportunity for water. Trail camera monitoring on other guzzlers we have installed (16 in the last 6 years) show a large variety of use from insects to big game. The guzzler type is the Boss Tank guzzler kit. They have a gathering apron and storage tank that is covered to minimize evaporation.
Comment 02/11/2019 Type: 1 Commenter: Monson Shaver
Kreig, I would add a line under In-kind for the cultural resources inventory. Include a statement in Compliance regarding your plans for cultural consideration.
Comment 02/14/2019 Type: 1 Commenter: Kreig Rasmussen
Got with Chuck and added a line item.
Comment 02/11/2019 Type: 1 Commenter: Alison Whittaker
I feel like you left off several of the obvious species that will benefit from this project, such as deer, elk, sage grouse.
Comment 02/14/2019 Type: 1 Commenter: Kreig Rasmussen
Below is a cut and paste list of the species I had in the original submission. All that you mentioned were in the proposal. Mule Deer Elk Bobcat Greater Sage-grouse Black Bear Domestic Livestock Cougar Black-tailed Jackrabbit Bald Eagle
Comment 04/03/2019 Type: 1 Commenter: Kevin Gunnell
The seed mix attached is for project# 4778 (Pine Canyon -1500 acres, $164K). I don't think that's what you're really requesting. Could you upload the correct seed mix request? Thanks.
Comment 04/05/2019 Type: 1 Commenter: Kreig Rasmussen
Thanks for the catch on that. I have the correct file attached to the project now.
Comment 03/25/2019 Type: 2 Commenter: Alison Whittaker
Kreig - I was just going through your finance page and I combined all of the Habitat Council request into one line item in the funding section. You had in-kind listed with the Habitat Council, however Habitat Council can't have in-kind listed. Please add a funding line item for each funding source providing in-kind to the project. Thanks.
Comment 08/26/2020 Type: 2 Commenter: Alison Whittaker
Please enter any missing expenses, highlighted in rust, on the Finance Page. When you have completed that please go back to the Completion Form and finalize your report again so I know that it has been completed. Thanks.
Comment 08/31/2020 Type: 2 Commenter: Alison Whittaker
Thanks for making those corrections. I have moved this project to completed.
Completion
Start Date:
05/04/2020
End Date:
06/30/2020
FY Implemented:
2020
Final Methods:
Guzzler kits were ordered and delivered to Richfield in the late fall of 2019. We started to deliver guzzlers and fencing supplies to the six various sights in mid May. WRI made rental arrangements for a Kubota 040 mini excavator. Richfield Ranger District provided a Bobcat with a six way blade and post hole digging attachment. We started installing the 4 large big game guzzlers in May and Mid-June and ended the installation process by installing the small sage grouse guzzlers in late June. Guzzler installation would generally take a day while mobilization of equipment to the next site would take extra time. Fence installation was coordinated with volunteers from Rocky Mountain Elk Foundation and UDWR Dedicated Hunters.
Project Narrative:
RMEF has help us install and fence a guzzler or two on their annual Summer Rendezvous. This year was different with COVID-19 guidelines for social distancing. We made adjustments by having the guzzlers installed prior to the June 27 work day. We felt fencing would be more conducive to social distancing and we could still sponsor a work day for 60-80 volunteers. We had approximately 60 volunteers show up for the work day. We had a morning briefing and safety meeting prior to splitting the group into four equal sized groups. Volunteers with past experience were organized among each group to facilitate proper installation of fencing and lodge-pole crossings. Assignments were given to individuals for specific duties on the fence project. Seeding disturbed soil was also accomplished with volunteers. Since tanks were installed prior to the work day and a few rain showers had come to the area-a few of the large guzzler drinker tanks had 8-10 inches of water stored. Volunteers were a huge part of this project becoming a success.
Future Management:
The Last Chance area is a fantastic wildlife area because of a diverse eco-system. There is sufficient feed for a variety of wildlife but the area lacks water in a variety of locations. Future projects would benefit a variety of wildlife if more guzzlers were installed in key locations. Sage grouse, big game, upland game, small game, insects, etc. will benefit from the planned vegetation treatments and guzzlers long into the future.
Map Features
N/A
Project Map
N/A