Yellowjacket (Sethy's)
Project ID: 5264
Status: Completed
Fiscal Year: 2021
Submitted By: 1160
Project Manager: Steven Barker
PM Agency: Bureau of Land Management
PM Office: Cedar City
Lead: Bureau of Land Management
WRI Region: Southern
Description:
Improve winter mule deer habitat and reduce hazardous fuels near the Coral Pink Sand Dunes State Park and residential areas by mechanically mulching approximately 1969 acres, chain harrow approximately 1229 acres, and seeding areas of pinyon, juniper, and decadent sagebrush along County Road 43 and Sethy's Canyon roads (see map).
Location:
Yellowjacket (Sethy's) project has two geographic locations to be treated with one area located west of the County Road 43 approximately 6 miles south of Mt. Carmel Junction and the Second East of the Hancock road and roughly 9 miles south of Mt. Carmel Junction.
Project Need
Need For Project:
The Yellowjacket (Sethy's) project area is Phase 8 of the 30,000 acre landscape level Yellowjacket Vegetation Enhancement Project. The need to rehabilitate vegetation communities within the Yellowjacket area has been recognized by numerous groups for many years. Plans including the Virgin River Watershed Management Plan (2006), Utah Division of Wildlife Resources Statewide Management Plan (2008), Southwest Support Area Fire Management Plan (2005) and the Kanab Resource Management Plan (2008) have all addressed resource and vegetation management needs with this area. Currently, the area is in a mid to late seral stage with a downward trend of herbaceous understory vegetation and healthy shrub component. There are two concerns within the project area 1) even-aged, decadent stands of sagebrush with no understory and 2) the expansion and infilling of pinyon and juniper trees into areas once dominated by shrubs and herbaceous vegetation, ponderosa pine, and mountain brush communities. Even-aged, decadent sagebrush stands with little to no perennial understory and the expansion and infilling of pinyon and juniper have negatively affected soil resources, water and nutrient cycles, fire regimes, fuel loading, plant community structure and composition, woodland health, forage production, water quality/quantity and wildlife habitat. An interdisciplinary team, composed of BLM, UDWR and other groups have identified opportunities within the project area, which include: 1) reducing hazardous fuels and risk to life and property from catastrophic wildfire; 2) restoring and improving the sagebrush semidesert ecosystem; 3) increasing plant species and diversity and improving watershed conditions and water quality; 4) improving the health of both woodlands and sagebrush/grasslands by increasing vegetation diversity as well as age class structure; 5) decreasing the amount of pinyon/juniper expansion into areas historically dominated by shrubs, grass, and mountain brush, 6) enhancing important seasonal and year around habitat for several species of wildlife, in particular wintering mule deer(100% of project area is within wintering mule deer habitat). Previous phases of the project (Kinnickinnic, Cave Lakes, Farm Canyon, Harris Mountain, Chris Spring, Dixie Knoll, Coral Pink) and projects in similar areas, such as Muddy Creek and Fivemile have proven successful in restoring grass, forb, and shrub species to the site, decreasing erosion, improving species diversity and functional plant groups and improving winter mule deer habitat (see Attached Photos).
Objectives:
1) Maintain or improve vegetative diversity and age class structure. 2) Re-establish frequency of grasses to 20%, forbs to 10% and shrubs to 30%. 3) Restore percent canopy cover or grasses to 30%, forbs to 10% and shrubs to 25%. 4) Decrease hazardous fuels by removing 95% of standing pinyon and juniper. 5) Reduce pinyon and juniper density. 6) Reduce even-aged, decadent sagebrush to increase sagebrush age class diversity and herbaceous perennial understory 7) Reduce sedimentation through erosion into Kanab Creek and the East Fork of the Virgin River.
Project Location/Timing Justification (Why Here? Why Now?):
Even-aged, decadent sagebrush and the invasion of pinyon and juniper trees into areas once dominated by grasses, forbs, and shrubs increases the risk of losing key areas for wildlife (ie. mule deer). Without this project, perennial grasses, forbs and healthy shrubs (sagebrush and bitterbrush) will not exist. Even-aged, decadent stands of sagebrush and the increase of pinyon and juniper also increases the risk of catastrophic wildfire in these habitats. The risk of cheatgrass and loss of sagebrush semidesert habitat after a wildfire could further impact habitat for wildlife. Catastrophic wildfire also threatens nearby infrastructure and outlying residential properties of the Yellowjacket area. Adjacent projects identical to the proposed project have proved successful in meeting objectives (see Attached Photos). However, as with any surface disturbing activity in sagebrush ecosystems, there is a low potential for weed invasion. BLM will aggressively treat any noxious weeds in the area if found.
Relation To Management Plan:
This project is in conformance with the Kanab Field Office Record of Decision and Resource Management Plan (RMP), signed October 31, 2008. VEG-30, 32, 33, 35 by treating sagebrush steppe communities to restore natural disturbance processes and a healthy, diverse mosaic of different height and age structures with components of native grasses forbs and an appropriate pinyon-juniper component for a given ecological site. Mosaics will include stands of young and old sagebrush and pinyon and juniper. SOL-3. states to treat areas that are prioritized within the plan. Virgin River watershed is the second priority behind the Upper Sevier watershed which also has projects within the WRI. The proposed treatment is consistent with Fish and Wildlife Habitat Management Decision #FW-01, which states: 1) that BLM will manage suitable public land habitats for the recovery or re-establishment of native populations through collaborative planning with local, state, and federal agencies, user groups, and interested publics; and 2) that BLM will also seed to limit additional adverse impacts to crucial habitats on public lands from urbanization and encroachment to preserve the integrity of wildlife corridors and migration routes and access to key forage areas. This proposal has been planned by a multitude of interested parties (ie. BLM, UDWR, SITLA, SFW, MDF, etc. Numerous other management plans have identified the need for these projects, including: Utah Division of Wildlife Resources Utah Mule Deer Statewide Management Plan. Improvement of important winter mule deer habitat within this proposal will address the threat of losing this habitat that is crucial for successful mule deer populations. Quality and quantity of forage available will also increase. The plan states that the encroachment of pinyon and juniper threatens to choke out understory forbs, grasses, and shrubs and increase catastrophic wildfire. The proposal will remove the encroaching pinyon and juniper and will restore the understory. The proposed project is consistent with the Southern Utah Support Area Fire Management Plan dated September 9, 2004, which states: Mechanically treat to convert pinyon and juniper invasion (condition class 3) into sagebrush/perennial grass (condition class 1 or 2) vegetation types. Utah Wildlife Conservation Strategy (2005). Of particular concern within this area are: Mule deer, and shrub steppe (key habitat). This proposal will specifically address restoring winter mule deer habitat and improving shrub steppe by removing pinyon and juniper allowing for a mosaic of "edge" grass, forb and shrub habitat. BLM's Final Programmatic Environmental Report: Vegetation Treatments on BLM Lands in 17 Western States Programmatic Environmental Report, June 2007. This Environmental report addresses the pinyon and juniper encroachment on semi desert shrub and sagebrush steppe habitat. The Fundamental of Rangeland Health (43 CFR 4180) and Utah's Standards and Guidelines for Rangeland Health which address watersheds, ecological condition, water quality and habitat for special status species, National Fire Plan (2000). This proposal will directly address the NFP by restoring FRCC to an acceptable and historical level. Healthy Forest Restoration Act of 2003 which state protecting forests, woodlands, shrub lands, and grasslands from unnaturally intensive and destructive fires. This proposal will reduce the impact of catastrophic wildfire in the area (see Fire/Fuels section below). Wildlife Action Plan (2015). This proposal specifically addresses treatments to improve the health of the Gamble Oak Terrestrial Key Habitat and Lowland Sage Key Habitat areas. Pinyon and juniper has encroaching into these key habitats. Action within the proposal will remove these species to allow for a more diverse, healthy understory of grasses, forbs and shrubs.
Fire / Fuels:
Within the project area there is a large fuel loading build up and an alteration in fuel types. Pinyon and juniper trees and even aged, decadent sagebrush, once held to lower densities by more frequent fires, have expanded in range and moved into areas once dominated by shrubs, forbs, and grasses. Without this project, fuel conditions are such that an unexpected wildfire may be difficult to contain, leading to an increased risk to firefighter and public safety, suppression effectiveness and natural resource degradation such as loss of critical winter mule deer habitat. Fire Regime Condition Class (FRCC) within the project area is predominately FRCC 3 which is where fire regimes have been extensively altered and risk of losing key ecosystem components from fire is high. Treatments identified within this proposal (mulching) would help reduce hazardous fuel loads, create fuel breaks, and reduce the overall threat of a catastrophic wildfire which could impact outlying residential properties and infrastructure of the Yellowjacket area, Coral Pink Sand Dunes State Park, as well as firefighter and public safety. Treatments in and around the sagebrush semi-desert habitat would break up continuous fuels and reduce the risk of wildfire entering these sensitive areas. Removing pinyon and juniper and decadent sagebrush in a mosaic pattern would also break up continuous fuels and reduce the risk of a high intensity wildfire. Because there is a greater risk of conversion of shrublands to annual grasslands under a high intensity fire, managed, pro-active treatments proposed would reduce the likelihood of cheatgrass invasion and help perennial grasses and forbs persist long-term. The treatment proposed would help to effectively return this area to more resilient landscape by placing the fire regime closer to the historical range (FRCC1), where fire plays a role in the ecosystem.
Water Quality/Quantity:
The Sethy's project is located within the Upper Virgin River Watershed. The area is surrounded by deep canyons and steep cliffs which make the area vulnerable to high amounts of runoff and flash flooding. Portions of the project are important areas for the municipal watershed of Fredonia, AZ. Roughly 2,000 acres of the project area is dominated by Phase III juniper expansion with Phase II expansion on the outer edges of the project area. Reduced plant community composition, and structural diversity has caused a high proportion of bare ground which is susceptible to accelerated runoff and erosion into the Kanab Creek drainage and the East Fork of the Virgin River. This has resulted in a 303d listing for Kanab Creek for Total Disolved Solids (TDL). Removal of Phase II and III PJ encroachment and the increase of herbaceous perennial species, water quality and quantity should improve. Studies have shown that an additional 45 day increase of soil moisture can occur when pinyon and juniper is removed and a perennial herbaceous understory is established. Runoff will decrease and less sediment will be moved out of the watershed due to an increase of a herbaceous understory. Previous phases of this project have proven successful in reducing erosion as soils have stabilized once seeding is established.
Compliance:
Archaeological clearances will be completed prior to the 2021 Fiscal Year. Wildlife clearances will be completed prior to the 2021 Fiscal Year. NEPA for the Yellowjacket Vegetation Enhancement Project was signed December, 2012.
Methods:
Pinyon and juniper, which currently occupy and are encroaching upon the site will be removed through mechanical mulching (approx. 1,969 acres). Islands and corridors of pinyon and juniper would remain untreated throughout the unit, creating a mosaic pattern of treated and untreated vegetation. In addition, approximately 1,229 acres of even-aged, decadent sagebrush with no understory would be chain harrowed. Areas of older sagebrush would remain untreated throughout the unit, creating a mosaic of treated and untreated vegetation. Before mechanical implementation, treated areas would be broadcast seeded with a mix of native and non-native shrubs, grasses and forbs important for improving winter mule deer range and stabilization of soils.
Monitoring:
Vegetation Monitoring Plans: Pre and post project implementation vegetation monitoring will occur within the project area and will include photo documentation. Wildlife Monitoring Plans: Currently, mule deer pellet counts occur each year. Mule deer pellet counts will continue on a yearly basis. Wildlife studies such as mule deer counts would continue with coordination with UDWR and local working groups.
Partners:
There has been various partners throughout the previous phases of this project. They include: Bureau of Land Management, Division of Wildlife Resources, Forestry Fire and State Lands, Mule Deer Foundation, Sportsmen for Fish and Wildlife, Utah Bowman's Association, Safari Club, Friends of the Paunsaguant, and local livestock grazing permittees. Many partners have provided funds as well as ideas to the success of the project. The Upper Virgin River Watershed Plan which identifies the priorities and concerns within the project area was accomplished by many partners (Federal, State, and Private). Tours and visits with various groups have occurred multiple times on this project. We have looked at treated as well as non-treated areas. Discussions of methods, ideas, studies, seeded species, and overall what worked and didn't work took place on each of these visits and has been implemented into the project proposal.
Future Management:
This project area is within two grazing allotments. All areas seeded will be rested for a minimum of two complete growing seasons or until the seedlings become established and set seed. Once seeding establishment has been confirmed, the Sethy's Canyon Allotment and the Farm Canyon allotment will be able to be used as a rotational pasture system. BLM may authorize grazing according to the Utah Fundamentals of Rangeland Health and Guidelines for Grazing Management (2007). Vegetation will continue to be monitored for utilization, cover and trend. Following the rest period, the current management plan will govern. If needed, grazing adjustments would be made in Grazing Allotment Plans and through the grazing permit renewal process. Future maintenance projects to protect investments made by UWRI/BLM have been addressed and allowed through the project planning documents (NEPA). Adaptive management has been allowed for in the NEPA documents. Many tools have been analyzed in the NEPA planning process to allow other methods of treatment in the future.
Sustainable Uses of Natural Resources:
The Sethy's project area covers portions of two allotments, The Farm Canyon allotment and The Sethy's Canyon allotment. Livestock use occurs between July 1 - December 30 annually. The Farm Canyon allotment is 3,282 acres and is used by livestock July-1 thru October-15. The Farm Canyon allotment is divided into two pastures, the larger pasture was treated 5 years ago (Phase 3) and grazing returned to that pasture two years ago, allowing for treatment and rest of the other pasture. The acres of these allotments that are in late seral stages are sites that have been encroached and infilled by pinyon and juniper. Pinyon and juniper is out competing the shrub and herbaceous components thus reducing available forage for livestock and wildlife. Rangeland conditions are expected to improve(and have improved in previous treatments) following implementation of the proposed vegetation project. The health, vigor, recruitment and production of perennial grasses, forbs and shrubs would improve which would provide a more palatable and nutritional source of forage for both livestock and wildlife. Once vegetation is established, the allotments would be once again used in a pasture rotation. This will aid in rest and improved rangeland conditions throughout the allotments. Implementation of this project would eventually improve overall livestock performance (e.g. increased cow weights, increased calf crops, increased weaning weights, etc) and improve the economic stability of the permittee due to an increase in the quantity and quality of grasses and other herbaceous forage which are important to livestock grazing. Forage production has increased from 35 lbs/acre to over 3,000 lbs/ acres once treatment is completed and seeding is established on previous phases of this project. In addition to livestock grazing benefits, the area serves as critical wintering mule deer habitat for the famed Paunsagunt Mule Deer unit and a very popular mule deer hunting area within the Zion mule deer management unit. Big game would reap similar benefits as livestock in the area (increased forage, health, performance, etc.). The success of this project would lead to success of healthy mule deer populations and increased hunting opportunities. Currently hunting permits for the Zion unit number at approximately 2,451 permits which brings not only local hunters to the area, but hunters from other parts of the country to the area and has a significant positive economic impact on local communities. The Sethy's project area is home to wintering grounds for Mule Deer from the famed Paunsaugunt hunting unit. This area is unique to the fact that it is one of only three hunting units in the state of Utah labeled as a Premium Mule Deer hunting unit. Each year the area draws hunters from areas nation wide and brings in large amounts of dollars from the sale of conservation permits to hunters seeking the opportunity to hunt this area. These conservation dollars in turn can be used in the future for improving habitats and needed wildlife projects. This project will help in maintaining/improving the area for these opportunities, as well as improve the overall health of big game populations in the area. Multiple recreation opportunities can be found in the area and include but are not limited to hunting, ATV riding, mountain biking, climbing, camping, and wildlife watching. Located near and around multiple National Parks and Monuments, this area serves as a stopping point for those seeking these activities. This project will help to improve the areas visual effects as well as help mitigate large scale wildfires that could have a devastating effect on recreation opportunities for years to come. Non-use agreements have been signed by the permittee to allow rest for a minimum of two growing seasons or until it is determined that recovery efforts have met the objectives outlined for this project.
Budget WRI/DWR Other Budget Total In-Kind Grand Total
$1,208,649.70 $4,000.00 $1,212,649.70 $25,000.00 $1,237,649.70
Item Description WRI Other In-Kind Year
Contractual Services Aerial seeding contract for Bureau of Land Management administered lands. (2,571 acres @ $15/Ac) $38,565.00 $0.00 $0.00 2021
Other Cadastral Survey $0.00 $4,000.00 $0.00 2021
Seed (GBRC) Seed Mix for Bureau of Land Management Administered Lands (2,571 acres @76.35/ac) $196,295.85 $0.00 $0.00 2021
Personal Services (permanent employee) Project layout, contract preparation and contract administration for mechanical mulching, chaining, aerial seeding and archaeological contracts. $0.00 $0.00 $25,000.00 2021
Archaeological Clearance Class III Arc clearance contract on BLM administered lands (2642 acres @ $21.50/ac) $56,803.00 $0.00 $0.00 2021
Contractual Services Chaining or chain harrow contract or in-house chaining or chain harrow (1229 acres @$100/ac) on BLM administered lands. $122,900.00 $0.00 $0.00 2021
Contractual Services Mechanical mulching contract (1898 acres @ $400/ac) on BLM administered lands. $759,200.00 $0.00 $0.00 2021
Contractual Services Aerial seeding contract (71 acres @ $15/ac) for State of Utah administered lands. $1,065.00 $0.00 $0.00 2021
Seed (GBRC) Seed Mix for State of Utah Administered Lands. (71 acres @ 76.35/ac) $5,420.85 $0.00 $0.00 2021
Contractual Services Mechanical mulching contract for State of Utah administered lands. (71 acres @ $400/ac) $28,400.00 $0.00 $0.00 2021
Funding WRI/DWR Other Funding Total In-Kind Grand Total
$1,208,649.70 $4,000.00 $1,212,649.70 $25,922.80 $1,238,572.50
Source Phase Description Amount Other In-Kind Year
BLM Fuels (Color Country) $0.00 $4,000.00 $25,000.00 2021
BLM Fuels (Color Country) A088 Mod 3 - $805k Mod 4 - $403,649.70 $1,208,649.70 $0.00 $0.00 2021
DWR-WRI Project Admin In-Kind $0.00 $0.00 $922.80 2021
Species
Species "N" Rank HIG/F Rank
Wild Turkey R1
Threat Impact
Inappropriate Fire Frequency and Intensity Medium
Mule Deer R1
Threat Impact
Inappropriate Fire Frequency and Intensity High
Mule Deer R1
Threat Impact
Problematic Plant Species – Native Upland High
Gambel's quail R3
Threat Impact
Inappropriate Fire Frequency and Intensity Medium
Habitats
Habitat
Gambel Oak
Threat Impact
Inappropriate Fire Frequency and Intensity High
Lowland Sagebrush
Threat Impact
Inappropriate Fire Frequency and Intensity Very High
Lowland Sagebrush
Threat Impact
Problematic Plant Species – Native Upland Medium
Mountain Sagebrush
Threat Impact
Inappropriate Fire Frequency and Intensity Medium
Mountain Sagebrush
Threat Impact
Problematic Plant Species – Native Upland Very High
Project Comments
Comment 01/20/2020 Type: 1 Commenter: Keith Day
Steven, This is a very dry area. Will there be any water source developments associated with this project? Keith
Comment 01/22/2020 Type: 1 Commenter: Steven Barker
Keith: Thank you for the comment. The project area has completed water source developments from the past that include a pipeline and large storage tank. There are also plans to continue with these water projects in the future with more development as well as using the tank to feed water to other locations within the project.
Comment 02/07/2020 Type: 1 Commenter: Michael Golden
Hey Steve, In the partners section we are instructed to award up to 5 points for the following "If applicable, does the project cross jurisdictional boundaries? If the proposed project area borders other ownerships, was consideration given to expand the project to a broader landscape? If no opportunity existed, award full points. If an opportunity existed and minimal or no outreach occurred, score accordingly." I can see on the map you are treating a little bit of SITLA you may want to discuss this and any outreach/attempts to work with private landowners immediately adjacent to the project.
Comment 02/07/2020 Type: 1 Commenter: Steven Barker
Mike, thank you for all of the time and effort that you and the other rankers put into reviewing these projects. We met with all of our partners in early January of this year and discussed all of our upcoming projects including Yellowjacket. It was determined that for this phase of Yellowjacket that it would only encompass Bureau of Land Management lands. The Sitla portion shown is a small mapping error, we will not include that into the project due to the terrain located within these boundaries. We plan to continue our work with our partners on future projects in the greater Yellowjacket area.
Comment 02/07/2020 Type: 1 Commenter: Danny Summers
Nice seed mix. Will the bitterbrush be seeded using another method other than broadcasting?
Comment 02/10/2020 Type: 1 Commenter: Steven Barker
Danny, thank you for your comments. The local office has worked very hard over the last 7-8 years in this area, with the help of Kevin Gunnell and others with GBRC, to find a diverse and effective seed mix. Currently our plans would be to broadcast the bitterbrush followed up with a bullhog and harrow thus tracking over the area with dozers. In the past, the local office has been very supportive of the Dedicated Hunter program in finding projects for hunters to fulfill needed work hours, this would be another project to incorporate the planting of bitterbrush with their help by using hand planters.
Comment 08/23/2021 Type: 2 Commenter: Daniel Eddington
Thank you for submitting your completion form on time. Thanks for uploading pictures! On the finance-expense page there is amount highlighted in red in the "Through Other" and "Inkind" that needs information to be entered. Also, the completion report said that 1,879 acres were completed by mulching, but the Map Page only shows 1,410 acres. Same issue with chain harrow, completion report says 340 acres but the map page shows 1,225 acres. Will you adjust map page to match what was completed. When you have completed that, please go back to the Completion Form and finalize your report again so I know that it has been completed. Thanks.
Comment 08/23/2021 Type: 2 Commenter: Daniel Eddington
Thank you for making the changes. I have moved this project to completed.
Completion
Start Date:
09/30/2020
End Date:
03/16/2021
FY Implemented:
2021
Final Methods:
Aerial seeding contract started on January 7, 2021. Contract was completed in two days. A total of 2,019 acres were seeded with a mix of grasses, forbs, and shrubs with a fix wing aircraft contracted by Hammond Helicopters. Mechanical mulching began shortly after on January 11, 2021. Brushwacker completed the Yellowjacket Sethy's and Farm Canyon area treatments for a total of 1,679 acres. Mulching was completed on March 16, 2021. Chain harrow work was completed in house for a total of 549 acres.
Project Narrative:
Started seeding on January 7, 2021 by aerially seeding grasses, forbs, and shrubs with a fix winged aircraft. Contractor completed project within 2 days. Seed was consistent throughout the project area and contractor did good job ensuring stipulations were met. In house chain harrow work started Januray 11, 2021. Chain harrow work was completed in house to be able to chain the area with various levels of disturbance. The area contained large stands of sagebrush. Because we wanted to vary diversity throughout the area some areas were chained once, other areas were doubled chained and other areas remained undisturbed. Chaining was completed within a month and a half and seemed to achieve the desirable effects. Mulching began on January 11, 2021 which was much later then desired due to the contractor having another contract through the state of Utah. Brushwacker Inc. was awarded the contract. Five machines were brought in as to complete the project within the time frame. Contractor did an exceptional job in meeting expectations and finishing within the time frame on March 16, 2021. Overall project went very well with just a few minor setbacks. Aerial seeding and mechanical mulching contract was let through the WRI process and was administered by BLM and UDWR personnel. Dozers for the chaining was obtained through contract with the WRI and operated by BLM personnel.
Future Management:
Project area will be monitored for vegetative trend, cover and wildlife use for the next 3 years. The project area will be rested from livestock for a minimum of 2 complete growing seasons in order to allow the seedlings to become established and set seed. This rest period may be extended if monitoring shows the seeding has not sufficiently established. Maintenance of the project will be completed in the future by lop and scatter projects.
Map Features
ID Feature Category Action Treatement/Type
10690 Terrestrial Treatment Area Bullhog Full size
10690 Terrestrial Treatment Area Seeding (primary) Broadcast (aerial-fixed wing)
10691 Terrestrial Treatment Area Bullhog Full size
10691 Terrestrial Treatment Area Harrow > 15 ft. (2-way)
10691 Terrestrial Treatment Area Seeding (primary) Broadcast (aerial-fixed wing)
10692 Terrestrial Treatment Area Harrow > 15 ft. (2-way)
10692 Terrestrial Treatment Area Seeding (primary) Broadcast (aerial-fixed wing)
Project Map
Project Map