Thousand Lakes Habitat Improvement Phase II
Project ID: 6031
Status: Completed
Fiscal Year: 2023
Submitted By: 995
Project Manager: Jim Lamb
PM Agency: Utah Division of Wildlife Resources
PM Office: Southern Region
Lead: U.S. Forest Service
WRI Region: Southern
Description:
Lop and scatter Pinyon and Juniper on 2,820 acres to benefit Greater Sage-grouse, Pygmy Rabbits, Domestic Livestock, Mule Deer and Elk. This phase follows up 1491 acres of lop and scatter completed in 2021.
Location:
Roughly 6 miles NE of Loa, Utah on National Forest administered lands. The project will occur on the west face of Geyser Peak and in Garden Basin.
Project Need
Need For Project:
This phase of the project proposes to address watershed-wide ecosystem health through reducing conifer encroachment on 2,820 acres of sagebrush and Mountain Brush capable landscapes. This is phase two of a greater than 15,000 acre focus area with NEPA approved treatments on the Thousand Lake Mountain, much of which is critical winter habitat transitioning into critical summer habitat for mule deer and crucial elk winter range. In the lower elevations of Polk Creek there are areas of potential Pygmy Rabbit habitat that are also being threatened by pinyon and juniper expansion. Currently surveys for these rabbits are ongoing. Over 1,500 acres of the proposed treatment area lies within the Parker Emery SGMA and ties into over 18,000 acres of completed pinyon and juniper reduction as part of the Mytoge Mountain wildlife habitat improvement project. Part of this project phase is within one mile of an active Sage-grouse lek (Tidwell). This lek has shown declining counts over the last ten years. Radio collars have been deployed on Sage-grouse at this lek and telemetry locations indicate that these grouse need more usable space nearby the lek. An image of those telemetry locations is attached to this proposal. All six collars deployed in 2018 and 2019 are now off the air. This proposal addresses conifer expansion and provides for increased big game forage through pinyon and juniper reduction. In order to address this concern and maintain persistent large open sagebrush landscapes, encroaching conifers in phase I and early phase II will be removed. Persistent woodlands and big game travel corridors will be retained. Lop and scatter will occur where appropriate for the density of encroaching conifers (9,893 acres). We need to enhance habitat on Forest Lands to promote increased utilization of big game animals and lessen the impact on National Park Service lands east of the project. During an aerial elk survey in 2016 over 1200 elk were using areas inside Capitol Reef National Park. The Park is concerned about impacts to cryptobiotic soil crusts and limited water sources.
Objectives:
1) Mitigate the threat of conifer expansion into crucial sage-grouse nesting and brood rearing habitat, critical summer mule deer habitat and crucial elk winter habitat. 2) Provide increased forage for big game transitional range by an estimated 450-600 pounds per acre. 3) Improve and expand habitat for sensitive, threatened and endangered species including reducing canopy cover of pinyon/juniper near the Tidwell lek to less than 4% cover to benefit Sage-grouse. Pygmy rabbit surveys in potential habitat in lower Polk Creek are ongoing. 4) Manage forest cover types to provide variety in stand sizes, shape, crown closure, edge contrast, age structure and interspersion. 5) Increase overall forage production, habitat quality, and species diversity by treating in a mosaic pattern that will create biodiversity across the landscape. 6) Reduce risk of catastrophic fire by reducing hazardous fuels while maintaining and improving fire resilient landscapes. 7) Minimize project costs by promoting cost effective treatments along with increased scale and size of treatments that will reduce overall cost per acre. Especially if treatments are delayed and treatment areas transition to phase III p/j enchroachment. 8) Enhance habitat on Forest Lands to promote increased utilization of big game animals and lessen the impact on National Park Service lands east of the project. During an aerial elk survey in 2016 over 1200 elk were using areas inside Capitol Reef National Park. The Park is concerned about impacts to cryptobiotic soil crusts and limited water sources by these elk numbers.
Project Location/Timing Justification (Why Here? Why Now?):
Hand treatment areas range from early to late phase I pinyon-juniper succession. Withholding treatment will transition the late phase I areas into phase II needing mastication treatment and re-seeding probably within 10-15 years. Mastication treatment areas proposed for later phases treat early through late phase II. Greater infill into these areas will increase per-acre treatment costs. This pinyon/juniper removal project also addresses inappropriate fire frequency and intensity in relation to the threat of Problematic Native Plant Species in Mountain Sagebrush systems. This project area is in danger of crossing an ecological threshold in the near future if left untreated. This proposed action would lower the need for seeding the area post-treatment, and will be easier and less expensive to treat than a later successional encroachment phase. The greatest risk to this project's success is the same as inaction and eventual wildfire occurrence, with the possibility of cheatgrass invasive species post treatment. Within the phase I treatments, most have a good understory still present but pinyon/juniper encroachment continues on a yearly basis into these more productive sage/grass/forb communities. Areas that have experienced disturbance in the past show a great bitterbrush response while next to these small openings the understory is lacking. If left untreated these areas with productive sage/grass/forb communities will degrade in productivity and treatment costs in the future will go up dramatically. As pinyon/juniper has become dominant on the landscape and the loss of understory vegetation increases, big game and small game animals and birds are experiencing a loss of foraging habitat. This compression of more pinyon/juniper and less sage/grass/forb habitat has contributed to the decrease in Mule deer populations and other wildlife species on the mountain. Mule deer on the Thousand Lakes Unit have seen a steady decline in population of over 470 animals or 35% of the population in the last six years. Deer population estimate models show a decline from 1320 in 2014 to 850 in 2020. When populations are modeled for 2021 the population will show another decline. The pinyon/juniper enchroachment in this project area are a limiting factor for wintering and transitioning populations of Mule Deer. Within future phases of mastication treatments, seeding will occur on the project to promote grasses and forbs in the effort to out-compete the cheatgrass. Some understory sage/ grasses/forbs still exist but is about to cross the threshold into phase 3 dominated PJ and lose the remaining understory. Ground surveys and site visits have allowed us to see the lack of understory plants in the pinyon/juniper complex on the east and west sides of Thousand Lake Mountain. The portion of the project area within the Parker SGMA is already at greater than 4% canopy cover that can put Greater Sage-grouse at risk. Allowing these areas to further increase in pinyon-juniper canopy cover would continue to be a detriment to sage-grouse populations in the area. Sage-grouse populations in the Parker SGMA have steadily declined in recent years in this project area. The sage-grouse hunt in this area was discontinued this year because the population met the criteria for one hard federal adaptive management trigger. The project polygons are within one mile of the Tidwell lek. Typically nesting and early brood rearing occurs within roughly 3 miles of leks and pinyon/juniper removal in this area should increase usable space for Sage-grouse. The project would also encourage understory forbs and grasses to be more vigorous. This population of Greater Sage-grouse need all the help they can get and any useable space, especially near a lek, would be a great benefit to the grouse using the Tidwell lek. Big game winter use of National Park Service lands has been a source of contention. During an aerial elk survey in 2020 over 1600 elk were using areas inside Capitol Reef National Park. If acres of national forest lands, like these polygons, are returned to properly functioning conditions, it is possible that big game animals will spend more time on National Forest lands and less on National Park Service lands. The Fremont River Ranger District expects that long-term cumulative effects from this project will be positive in providing an increase in forage for wild and domestic grazing ungulates. Parts of the pinion-juniper zone on the east side of these areas serve as transition range and winter range for big game and because it is in poor condition animals fail to remain in this zone for the season of use that should be normal. Big game, because of the lack of good forage, have a tendency to migrate to the lower part of the mountain in the winter, especially near private lands and highways, and return to the higher elevations in early spring before range readiness.
Relation To Management Plan:
1) Fishlake Land and Resource Management Plan (LRMP) also referred to as the "forest plan" LRMP IV-3. Integrate vegetation management with resource management to maintain productivity and provide for diversity of plant and animal communities. LRMP, IV-3. Coordinate wildlife and fish habitat management with State and other Federal and local agencies. LRMP, IV-4. Identify and improve habitat for sensitive, threatened and endangered species including participation in recovery efforts for both plants and animals. This project will contribute to Mule Deer recovery on this unit and help Elk habitats keep animals in preferred wintering areas. Removal of pinyon and juniper trees contributes to the health of our sagebrush steppe ecosystem in this area. 2) Utah Wildlife Action Plan, 2015 Publication Number 15-14, State of Utah, Department of Natural Resources, Division of Wildlife Resources, Effective 2015-2025 -- Promoting and funding restoration that reduces the uncharacteristic and surpluses of older age class, including: Dixie/chain harrow, brush mowing or other treatments that reduce the older age class and stimulate the younger/mid age classes; herbicide or mechanical treatment of non-native invasive species such smooth brome; single tree mulching/cutting of invading conifer (p.51). This juniper removal project also addresses uncharacteristic and surpluses of older age class trees and reduces the threat of Problematic Native Plant Species in Mountain Sagebrush systems. 3) US Forest Service Greater Sage-grouse Utah Amendment, September 2015. Objective: Every 10 years for the next 50 years, improve greater sage-grouse (GRSG) habitat by removing invading conifers. Desired Conditions: In GRSG seasonal habitat, capable of producing sagebrush, have less than 10% conifer canopy cover. Vegetation treatment projects should be conducted if they maintain, restore or enhance desired conditions for sage-grouse. This project improves greater sage-grouse habitats by removing invading conifers to restore and enhance desired conditions. 4)Parker Mountain Greater Sage-grouse (Centrocercus urophasianus) Local Conservation Plan, October 1, 2006. 2. Strategy: by 2011, make an assessment of non-desirable/invasive vegetation in sage-grouse habitats. 2.5. Action: Treat areas where undesirable vegetation has become, or is at risk of becoming a factor in sage-grouse habitat loss or fragmentation. 5) Conservation Plan for Greater Sage-grouse in Utah January 11, 2019 4c. Using WRI, remove conifer as appropriate in areas protected by federal, state and private landowners to ensure that existing functional habitat remain. 4d. Using WRI, maintain existing sage-grouse habitats by offsetting the impacts due to conifer encroachment by creating additional habitat within or adjacent to occupied habitats at an equal rate each year - or 25,000 acres each year- whichever is greater. 4e. Increase sage-grouse habitats by using the WRI- and other state, federal and private partnerships- to restore or create 50,000 acres of habitat within or adjacent of occupied habitats each year in addition to 4d. This project restores and maintains useable space for greater sage-grouse by addressing impacts from conifer expansion into sage steppe habitats. 6)U.S. Fish and Wildlife Service, Greater Sage-grouse (Centrocercus urophasianus) Conservation Objectives: Final Report. U.S. Fish and Wildlife Service, Denver, CO. February 2013. General Conservation Objectives: 1. Stop population declines and habitat loss. 2. Implement targeted habitat management and restoration. Specific Conservation Objectives: 1. Retain sage-grouse habitats within PAC's. 3. Restore and rehabilitate degraded sage-grouse habitats in PAC's. Conservation Objective: Maintain and restore healthy native sagebrush plant communities within the range of sage-grouse Conservation Objective: Remove pinyon/juniper from areas of sagebrush that are most likely to support sage-grouse (post-removal) at a rate that is at least equal to the rate of pinyon/juniper incursion. -Prioritize the use of mechanical treatments. -Reduce juniper cover in sage-grouse habitats to less than 5% but preferably eliminate entirely. -Employ all necessary management actions to maintain the benefit of juniper removal for sage-grouse habitats. All of these management plans relating to Sage-grouse are being addressed by this treatment of pinyon/juniper adjacent to lekking and brood rearing areas. There is an image attached to this project showing Sage-grouse telemetry points collected from 2017-2019 that show sage-grouse use in and around this projects proposed treatment areas. 7) Utah Division of Wildlife Resources Statewide Management Plan for Mule Deer. Section VI Statewide management goals and objectives. This plan will address Habitat Objective 2: Improve the quality and quantity of vegetation for mule deer on a minimum of 500,000 acres of crucial range by 2024 (pg19). Strategy D. Initiate broad scale vegetative treatment projects to improve mule deer habitat with emphasis on drought or fire damaged sagebrush winter ranges, ranges that are being taken over by invasive annual grass species, and ranges being diminished by encroachment of conifers into sagebrush or aspen habitats. Strategy f. Encourage land managers to manage portions of pinion-juniper woodlands and aspen/conifer forests in early successional stages. This project will reset the vegetative successional stage on 2,820 acres of critical Mule Deer habitat. 8) Plateau Deer Herd Management Plan Unit #25 (2020) - Habitat Management Objectives -- Encourage vegetation manipulation projects and seeding to increase the availability, abundance, and nutritional content of browse, grass, and forb species. Strategies: Habitat Protection, Improvement and Maintenance - Reduce expansion of Pinyon-Juniper woodlands into sagebrush habitats and improve habitats dominated by Pinyon-Juniper woodlands by completing habitat restoration projects like lop & scatter, bullhog and chaining projects; maintain summer fawning areas by increasing beneficial habitat work in summer and transitional habitat areas.(pgs 5-6) This project is expected to benefit Mule Deer by improving food resources long term and restoring sagebrush ecosystems which the deer rely on for browse especially in critical times of their life cycles. 9) Wayne County Resource Management Plan 2017. This action is congruent with Pinyon-Juniper page 49. 11. Pinyon-juniper -- Pinyon and juniper is eliminated or reduced on any site that has the potential to support grassland, sagebrush grassland, or other vegetation types more useful in terms of watershed condition and resource outputs, unless it has been determined, on a site specific basis, that PJ does not jeopardize watershed condition and adds to the combined resource outputs and values on the site. On sites where pinyon-juniper occurs that do not have potential for good perennial grass and shrub cover, or where technology is lacking to establish such cover by reasonable efforts, pinyon-juniper stands are maintained in an open canopy state when possible to prevent catastrophic wildfire and stand replacement with invasive annuals. (p.49) This project site has the potential to support grassland, sagebrush grassland, or other vegetation types more useful in terms of watershed condition and resource outputs if treated to remove the pinyon/juniper trees. 10) This treatment is aligned with the State of Utah's Resource Management Plan, objectives for livestock and grazing under page 148. Actively remove pinyon-juniper encroachment in other ecological sites due to its substantial consumption of water and its detrimental effect on sagebrush, other vegetation, and wildlife. Water quality, quantity and livestock forage should improve by completing this project. 11) National Cohesive Strategy. By means of mechanical thinning at a landscape scale, the resulting mosaic of sagebrush and persistent pinyon-juniper forests will work toward the goal of restoring and maintaining resilient landscapes, one of the three goals described in the National Cohesive Strategy. 1. Resilient Landscapes General guidance regarding vegetation and fuels management include * Use and expand fuel treatments involving mechanical, biological, or chemical methods where economically feasible and sustainable, and where they align with landowner objectives. (pg. 58) This is phase one of a greater than 15,000 acre focus area with NEPA approved treatments on the Thousand Lake Mountain which should contribute to resilient landscapes. 12) State of Utah Catastrophic Wildfire Reduction Strategy The Thousand Lakes Project aligns with the mission of the State of Utah's Catastrophic Wildfire Reduction Strategy. The project has developed a comprehensive and systematic approach toward reducing the size, intensity and frequency of catastrophic wildland fires near the existing infrastructure. The project reduces the risk of a catastrophic wildfire occurrence negatively affecting property, air quality and water systems. The Mission: Develop a collaborative process to protect the health and welfare of Utahns, and our lands by reducing the size and frequency of catastrophic fires. (pg. 4) 5. Adopt Key Recommendations from the National Cohesive Wildland Fire Management Strategy. (pg. 15) * Encourage federal land management agencies to expedite fuels treatments. (pg. 15) * Prioritize landscapes for treatment (irrespective of jurisdictional boundaries). (pg. 15) This project will aid in reducing the size, intensity and frequency of future catastrophic fire on Thousand Lakes Mountain.
Fire / Fuels:
This area is within two miles of the Elkhorn guard station, a developed campground, and a portion of the Great Western Trail, all popular destinations throughout the summer. If a wildfire were to occur in this area, the historic Elkhorn guard station would be at risk and the Elkhorn developed campground and Fishlake portion of the Cathedral Valley loop, shared with Capitol Reef National Park, would likely have to close. Currently the FRCC is 60/30/10 and after treatment we expect it to be 50/20/30. This project area has enough canopy cover to carry a crown fire and reducing the canopy and creating openings should reduce the risk of catastrophic fire and create a more resilient landscape.
Water Quality/Quantity:
Kormas et al, Deboodt et al 2008, Baker et al 1984, Roundy et al 2014, Roth et al 2017 and Young et al 2013 all recommend pinyon and juniper removal to improve water quality and quantity. The Thousand Lake Habitat Improvement Project, contains a cumulative 15,567 acres of pinyon and juniper expansion reduction through hand cutting and mechanical means. Phase II contains 2,820 acres of hand cutting and is expected to increase water quantity through reduced conifer presence and improve water quality through decreased erosion due to greater ground cover. Waterbodies/drainages that will benefit from project activities and occur within the project area include Polk Creek, a perennial creek, Round Lake and it's associated wet meadows and wetlands and Upper Middle Desert Wash. The riparian areas of these areas will be treated to remove pinyon/juniper to the extent that shading is not impacted. These drainages receive flow/runoff from the project area and subsequently flow into the Lower Fremont River which is listed as a 303d waterbody for Total Dissolved Solids (TDS). Project activities would generate improved understory conditions, grass, forbs, and shrubs which should improve water quality by leading to less generation of sediment during overland flow events and thereby delivering less sediment to riparian areas and subsequent rivers and reservoirs. Reducing sediment travel from the project area can decrease pollutants in the Lower Fremont River. Additionally, vegetation treatments would be designed to reduce the risk of severe wildfire and all of those associated undesirable water quality effects. The watersheds in which the work is occurring support irrigation, important to the local agriculture economy.
Compliance:
The Fishlake National Forest Pinyon and Juniper Project Decision Notice was signed on December 5th, 2019. At the recommendation of U.S. Fish and Wildlife Service, rare plant surveys will occur prior to implementation.
Methods:
Lop and scatter will be used on 2,820 acres of sagebrush steppe and sagebrush semi-desert experiencing phase I transitioning into phase II of pinyon and juniper expansion.
Monitoring:
Repeat photo points and range site survey locations consisting of nested frequency sites recording vegetation and percent cover already exist within the proposed project area. Vegetation surveys will occur following treatment and five years after treatment. Monitoring is required under the Fishlake National Forest Pinyon and Juniper Project Decision Notice. Wildlife Population surveys for Sage-grouse will be conducted through the local UDWR Area Biologist and the local PARM Working Group annually. The Tidwell lek is a Sage-grouse lek near the project area and is a part of the Parker Mountain SGMA lek complex. Mule Deer classification routes are conducted in this area annually by DWR biologists. Pygmy rabbit surveys will be continued during this project phase. Before and after treatment photos will be taken and posted onto the WRI database. These tools for assessing potential for conifer encroachment and invasive plant establishment, as well as a qualitative site condition assessment, will be completed in accordance with existing monitoring protocols. Proposed funding for weed control will go towards monitoring project areas pre-treatment and post-treatment to reduce impacts from noxious weeds.
Partners:
Project design and location has been coordinated between the USFS and UDWR. Castle Valley ranch has repaired two allotment fences in conjunction with this project and has a full-time rider that keeps cattle in the correct place throughout the season of use. This project addresses habitat concerns with Sage-grouse and Mule Deer, both of which have shown population declines in this area recently. The 18,000 acre Mytoge Mountain habitat projects which were planned and carried out jointly by the PARM local working group (Group members include representatives from: US Fish and Wildlife Service, Utah State University, Bureau of Land Management, Natural Resource Conservation Service, State of Utah Division of Forestry, Fire & State Lands, Wayne County Commission, Private Landowners, Utah Division of State Institutional and Trust Lands, Division of Wildlife Resources, and USU extension.), DWR and USFS are dovetailed into this project. Capitol Reef National Park has been a coordinator on the project polygon designs. This project has come about through a desire to provide crucial habitat improvements for Sage-grouse and big game and to distribute ungulate pressure across USFS and National Park Service lands. USFS and DWR are contributing in-kind finances to this project.
Future Management:
Working with permittees, seeded treatment areas in phase 2 p/j will be rested from grazing post-treatment a minimum of 2 years or as long as necessary for seeded areas to become established. A phased approach to implementation allows for sagebrush community response monitoring to inform future phases. Future phases of this project are planned to extend these treatments to the south. The project area will be monitored for re-encroachment and proposed for future re-treatment either through volunteers like the DH program or a full WRI proposal depending on the severity and extent of the re-encroachment. Most of the East Thousand Lake project is in the Solomon allotment which is a five pasture deferred rotation grazing system. Each pasture is grazed for about 30 days. There is a total of 559 head of cattle that graze from June 1 to October 31. 151 head of cattle are held off the allotment until June 15th to allow for better spring growth on the forage. The cattle enter the allotment near Meeks Lake/Morrell Pond on the first year and then move to East Tidwell pasture and then to Forsyth Unit then on to West Thousand Lake and finishing in the Round Lake Unit. The second Year the cattle would enter the Round Lake unit go to West Tidwell, Forsyth unit then East Tidwell and finish in the Meeks Lake /Morrell Pond unit. The Solomon allotment has a full time rider employed keeping cattle in the desired areas. Herding will be used to rest treated areas along with modifications to the grazing pasture rotation schedule. Pasture schedules will be changed/shortened to allow for plant response and recovery.
Sustainable Uses of Natural Resources:
The project area contains 6 miles of motorized and 4 miles of non-motorized trail. The nationally recognized Great Western Trail sits to the west of the project area. Trails will be maintained following project implementation. This portion of the Fishlake National Forest is adjacent to Capitol Reef National Park, which receives in excess of one million visitors per year, and is part of the road commonly driven as part of the Cathedral Valley loop. Removing pinyon and juniper trees should improve visitors ability to enjoy scenic National Park vistas and wildlife viewing opportunities. This project site has the potential to support grassland, sagebrush grassland, or other vegetation types more useful in terms of watershed condition and resource outputs if treated to remove the pinyon/juniper trees. This project will reset the vegetative successional stage on 2,820 acres of critical Mule Deer habitat. This should help a struggling Thousand Lakes deer herd with increased food resources which translates into more deer on the landscape and more deer available for viewing and hunting opportunities. Grazing management for domestic livestock will also be enhanced by completing this project. Where adjacent to existing roads, lop and scatter material from this project will be made available for firewood gathering.
Budget WRI/DWR Other Budget Total In-Kind Grand Total
$296,100.00 $0.00 $296,100.00 $20,000.00 $316,100.00
Item Description WRI Other In-Kind Year
Personal Services (permanent employee) UDWR Biologist time for planning and implementation. $0.00 $0.00 $10,000.00 2023
Personal Services (permanent employee) USFS personnel time for planning and implementation. $0.00 $0.00 $10,000.00 2023
Contractual Services Lop and Scatter contract @$100 per acre for 2,820 acres $282,000.00 $0.00 $0.00 2023
Personal Services (seasonal employee) Seasonal Employee and Supplies. Seasonal time for vegetation and weed monitoring as well as supplies for weed control. @$5/acre $14,100.00 $0.00 $0.00 2023
Funding WRI/DWR Other Funding Total In-Kind Grand Total
$314,337.27 $0.00 $314,337.27 $13,339.25 $327,676.52
Source Phase Description Amount Other In-Kind Year
DWR-WRI Project Admin In-Kind $0.00 $0.00 $1,684.54 2024
National Wild Turkey Federation (NWTF) S024 $38.80 $0.00 $0.00 2023
Internal Conservation Permit S0EL Elk $530.84 $0.00 $0.00 2023
Mule Deer Foundation (MDF) S023 $156.16 $0.00 $0.00 2023
United States Forest Service (USFS) $0.00 $0.00 $10,000.00 2023
Federal Aid (PR) P651 $3,465.00 $0.00 $0.00 2023
Sportsman for Fish & Wildlife (SFW) S027 $234.24 $0.00 $0.00 2023
Habitat Council Account QHCR $156.16 $0.00 $0.00 2023
Rocky Mountain Elk Foundation (RMEF) S025 $38.80 $0.00 $0.00 2023
DWR-WRI Project Admin In-Kind $0.00 $0.00 $1,654.71 2023
Habitat Council Account QHCR $28,081.11 $0.00 $0.00 2024
Federal Aid (PR) P651 $218,610.00 $0.00 $0.00 2024
Internal Conservation Permit SOEL Elk $33,494.16 $0.00 $0.00 2024
Mule Deer Foundation (MDF) S023 $9,843.84 $0.00 $0.00 2024
National Wild Turkey Federation (NWTF) S024 $2,461.20 $0.00 $0.00 2024
Rocky Mountain Elk Foundation (RMEF) S025 $2,461.20 $0.00 $0.00 2024
Sportsman for Fish & Wildlife (SFW) S027 $14,765.76 $0.00 $0.00 2024
Species
Species "N" Rank HIG/F Rank
Elk R2
Threat Impact
Improper Forest Management High
Elk R2
Threat Impact
Improper Grazing – Livestock (current) Low
Elk R2
Threat Impact
Inappropriate Fire Frequency and Intensity High
Greater Sage-grouse N3 R1
Threat Impact
Brush Eradication / Vegetation Treatments High
Greater Sage-grouse N3 R1
Threat Impact
Improper Grazing – Livestock (current) Low
Greater Sage-grouse N3 R1
Threat Impact
Inappropriate Fire Frequency and Intensity Very High
Wild Turkey R1
Threat Impact
Improper Grazing – Livestock (current) Low
Wild Turkey R1
Threat Impact
Inappropriate Fire Frequency and Intensity Medium
Mule Deer R1
Threat Impact
Improper Forest Management High
Mule Deer R1
Threat Impact
Improper Grazing – Livestock (current) Low
Mule Deer R1
Threat Impact
Inappropriate Fire Frequency and Intensity High
Pygmy Rabbit N4
Threat Impact
Invasive Plant Species – Non-native High
Habitats
Habitat
Aquatic-Scrub/Shrub
Threat Impact
Brush Eradication / Vegetation Treatments Medium
Aquatic-Scrub/Shrub
Threat Impact
Improper Grazing – Livestock (current) High
Aquatic-Scrub/Shrub
Threat Impact
Stormwater Runoff Low
Aquatic-Scrub/Shrub
Threat Impact
Fire and Fire Suppression Medium
Aquatic-Scrub/Shrub
Threat Impact
Relationship Between Groundwater and Surface Water NA
Lowland Sagebrush
Threat Impact
Brush Eradication / Vegetation Treatments Medium
Lowland Sagebrush
Threat Impact
Improper Grazing – Livestock (current) Low
Lowland Sagebrush
Threat Impact
Inappropriate Fire Frequency and Intensity Very High
Mountain Sagebrush
Threat Impact
Habitat Shifting and Alteration Medium
Mountain Sagebrush
Threat Impact
Improper Grazing – Livestock (current) High
Mountain Sagebrush
Threat Impact
Inappropriate Fire Frequency and Intensity Medium
Mountain Shrub
Threat Impact
Improper Grazing – Livestock (current) Low
Mountain Shrub
Threat Impact
Inappropriate Fire Frequency and Intensity Low
Project Comments
Comment 01/18/2022 Type: 1 Commenter: Jacob Benson
I am glad to read that a herder will be used to properly distribute livestock around the grazing area and move salt as needed. Good Job !
Comment 01/18/2022 Type: 1 Commenter: Jim Lamb
And that rider is doing a really great job! Very conscientious!
Comment 01/25/2022 Type: 1 Commenter: Keith Day
Jim, Any PYRA sign yet? I know it is historic habitat, but I have been hard pressed to find any when I have looked in that area. I suggest you avoid potential FEHA nest trees. Not a lot in that area, but there are a few. It would also be nice to avoid destruction of PIJA nesting colonies. Keith
Comment 01/26/2022 Type: 1 Commenter: Jim Lamb
We didn't find any PYRA in surveys last year but we will survey again this year. I surveyed for PIJA last year also and only observed small flocks that were covering a lot of territory. I'm looking forward to your training on PIJA. Can you provide guidance on potential FEHA nest trees. Around Lyman they seem to prefer cottonwoods.
Comment 01/26/2022 Type: 1 Commenter: N/A
Additionally, I will be out this spring and summer with my FS crews to survey these project areas as well for PYRA, PIJA and raptors as part of our NEPA compliance.
Comment 02/02/2022 Type: 1 Commenter: Michael Golden
Hey Jim, This looks like a great project. Thank you for explicitly telling the fish squeezer what the issues you are addressing for grouse and big game are. My only question would be $14k for weed and veg monitoring on 2,800 acres? That is at least 4 months of seasonal employee time...are they setting up quadrats on every acre or what?
Comment 02/02/2022 Type: 1 Commenter: Jim Lamb
Thanks Mike. We have been asking for $5/acre for the weed monitoring and treatment needs across the Forest in our proposals. I think this is in line with our goals and objectives.
Comment 02/06/2022 Type: 1 Commenter: Judi Brawer
I appreciate the use of lop and scatter here, instead of mastication or other ground disturbing methods. Questions: 1. What is the Forest Service doing to reintroduce fire into this project area and the broader project area? 2.What role has livestock grazing played in creating the current degraded conditions? And what adaptive management strategies will you be implementing to ensure the success of the treatments and prevent conditions from deteriorating again? I understand that there's a capable rider, which is great. Anything else being done to reduce grazing impacts?
Comment 02/07/2022 Type: 1 Commenter: Rick Oyler
The area around phase II is located in the Round lake pasture of the Solomon Allotment there has seen two natural fires in the Hens Peak area of this Pasture in the early 1990's.There was lightning strike fire in 2009 that was allowed to spread and burn 2400 acre fire in 2009. A small 350 acre fire was used as a management fire in the Pole Canyon area of this allotment in 2017. Cattle have been removed from the disturbed pastures for up to three years to allow for vegetation recovery. This allotment is run on a five pasture deferred grazing rotation that runs in a clockwise rotation on year one and a counter clockwise rotation on year two. On an every other year basis every pasture is rested through the early spring green up phase of plant growth. This allotment is in better soil and vegetation condition today that in was in the late 1980's. There were active rills and gullies all trough out the eastern portion of this allotment in the late 1980's. There rills and gullies have healed up with vegetation now holding the soil in place, this was accomplished with cattle grazing the area. The impacts from livestock grazing in this area are minimal due to the deferred rotation grazing system and permittees dedication to livestock management. The forest has in the past allowed natural fire to run there course in this allotment and current management would allow natural fire to burn in this area today. The current degraded conditions in this project area is a result in Pinyon and Juniper trees invading the mountain brush zone of the allotment. The Pinyon and Juniper trees out complete the Mountain shrub type vegetation for minerals and water due to there more extensive root systems. The results are less mountain shrubs and more trees. The mountain shrub zone of the Thousand Lake mountain is a critical forage zone for native wildlife species. Cattle have had little to no impact on Pinyon /Juniper trees invading the Mountain Shrub zone. The trees have invaded these zones due to the lack of natural fire. Fires have been allowed to burn in this allotment in the past but have never reached these areas that are proposed in this project.
Comment 02/07/2022 Type: 1 Commenter: Judi Brawer
Thanks so much for your detailed response, Rick. Greatly appreciate it. One more question: What cultural surveys and tribal consultation are being/have been conducted for this project?
Comment 02/07/2022 Type: 1 Commenter: Rick Oyler
Cultural surveys will be completed prior to any work being done on the ground. Most of the work on the Thousand Lake allotment will be hand thinning which will have less impacts to cultural resources but will be surveyed prior to any work.
Comment 02/07/2022 Type: 1 Commenter: Scott Chamberlain
Will there be islands left in some of the larger polygons?
Comment 02/07/2022 Type: 1 Commenter: Rick Oyler
Yes there are smaller areas within the polygons that will not be cut some of these are in rocky areas with little to no Mountain Brush type and other areas have larger type trees that will be left.
Comment 08/28/2024 Type: 2 Commenter: Alison Whittaker
Thank you for submitting your completion form on time. Please give some more details in the Completion Form about this project so anyone reading the report can understand the who, what, when, why, how, etc. of the project without needing to read the entire proposal.
Comment 09/09/2024 Type: 2 Commenter: Daniel Eddington
The acres mentioned in the report (324 acres and 2,259) equals 2,583, but the map page says 2,820 acres. Please make the two match. There are several images that have bad links and therefore can't be seen. This is because there is a colon (:) in the name of photo title. If that was removed it should upload correctly.
Comment 09/18/2024 Type: 2 Commenter: Alison Whittaker
Project has been moved to completed.
Completion
Start Date:
09/28/2023
End Date:
11/01/2023
FY Implemented:
2024
Final Methods:
Two treatment types were used to achieve the objectives. The lower portions of the project area were treated with greater sage grouse habitat components in mind with removal of pinyon and juniper trees near sage brush openings to extend suitable leking and broad rearing habitat on roughly 324 acres. This was achieved by the UDWR contracting a hand treatment lop and scatter crew in fall of 2023. The other treatment type was also a lop and scatter treatment removing successional pinyon and juniper trees with a < 12 inch DBH (diameter at breast height) , on roughly 2,259 acres. This portion of the project area was focused on improving big-game habitat for winter and summer range for mule deer and elk. The contractor completed this project with the use of hand tools and chainsaws. The contracted crew started in June of 2023 and completed the total acres of 2,583 by the end of July 2023. All successional pinyon and juniper trees < 12-inch DBH was removed. Patches and corridors of trees were left along with persistent pinyon and juniper areas for security hiding cover and edge habitat effectiveness.
Project Narrative:
The Forest Service USFS (Fremont River Ranger District) and the Utah Division of Wildlife Resources completed a habitat restoration project on the west slopes of Thousand Lake Mountain near Geyser Peak. This project objectives were to improve wildlife habitat including mule deer summer range and greater sage grouse habitat along the highway 72 corridor and to create a more fire resilient landscape. This project focuses on reducing pinyon and juniper succession on approximately 2,820 acres within the aspen, mountain shrub and sagebrush steppe vegetation types along the west slopes of Thousand Lake Mountain. In previous treatments nearby we have had increased use by Sage-grouse and Big Game. This project is part of ongoing treatments on Thousand Lakes Mountain. The two species we hope to help the most with these treatments are Mule Deer and Greater Sage-grouse. We have used radio telemetry monitoring in the past with Sage-grouse to observe increased use in past treatments.
Future Management:
Annual monitoring will be conducted by UDWR and USFS for Mule Deer, Elk and Greater Sage-grouse trends and classification. There are also nested frequency plots the USFS monitor as part of their range trend analysis. Wildlife data will be collected by USFS employees on Forest Sensitive species and Focal species post treatment.
Map Features
ID Feature Category Action Treatement/Type
11264 Terrestrial Treatment Area Vegetation removal / hand crew Lop and scatter
Project Map
Project Map