Cottonwood Trail Fire Rehab Project
Region: Southern
ID: 4369
Project Status: Completed
Map This Project
Export Project Data
Project Details
*
Need for Project
Cottonwood Trail Fire burned approximately 501 acres of BLM property in June of 2017. This burn happened in a critical area west of Oak City, Utah. Previous burns have recovered due to the restoration efforts of the BLM, SITLA, and Private entities. The need to reseed this area is a concern due to the fact that cheatgrass is an issue, soil conditions are a concern and the possibility of not having any grasses, forbs and shrubs to prevent wind and soil erosion is critical. The Fillmore BLM Office is looking to provide ESR Stabilization Funding to help partner with the UDWR to complete this reseeding effort.
Provide evidence about the nature of the problem and the need to address it. Identify the significance of the problem using a variety of data sources. For example, if a habitat restoration project is being proposed to benefit greater sage-grouse, describe the existing plant community characteristics that limit habitat value for greater sage-grouse and identify the changes needed for habitat improvement.
*
Objectives
Objectives of this project is to reseed a simple diverse mix of grasses, forbs and shrubs back into the site. This will help stabilize the soil prevent wind and rain erosion and allow for wind to not move the soil around during critical times of year. Project will also allow for the reduction of noxious weed species that can take hold if nothing is done in this area. Providing a drill seeding treatment will increase the success of this project and in the future provide additional forage for wildlife and livestock.
Provide an overall goal for the project and then provide clear, specific and measurable objectives (outcomes) to be accomplished by the proposed actions. If possible, tie to one or more of the public benefits UWRI is providing.
*
Project Location/Timing Justification (Why Here? Why Now?)
Threats for this area include the risk of cheatgrass and Squarrose Knapweed invasion along with Scotch Thistle. If reseeding efforts are not successful further erosion and soil movement.
LOCATION: Justify the proposed location of this project over other areas, include publicly scrutinized planning/recovery documents that list this area as a priority, remote sensing modeling that show this area is a good candidate for restoration, wildlife migration information and other data that help justify this project's location.
TIMING: Justify why this project should be implemented at this time. For example, Is the project area at risk of crossing an ecological or other threshold wherein future restoration would become more difficult, cost prohibitive, or even impossible.
*
Relation to Management Plans
he pinyon-juniper and big sagebrush areas lie within the Lowland Sagebrush Steppe Habitat type which is one of the key habitats identified in the 2015 WAP. The proposed projects will address some of the habitat management strategies outlined in the deer and elk management plans for herd unit 21 (Fillmore Oak Creek Unit ) including: *Continue to improve and restore sagebrush steppe habitats critical to deer according to DWRs Habitat Initiative. *Maintain habitat quantity and quality at a level adequate to support the stated population objectives while at the same time not resulting in an overall downward trend in range condition and watershed quality. *Work cooperatively with land management agencies and private landowners to plan and implement improvement projects for the purpose of enhancing wildlife habitat and range resources in general. *The project also helps fulfill the state mule deer management plan section IV Habitat Goal: Conserve and improve mule deer habitat throughout the state with emphasis on crucial ranges. *The proposed projects will address the following goals and objectives of the Division of Wildlife Resources most recent strategic management plan: *Resource Goal: expand wildlife populations and conserve sensitive species by protecting and improving wildlife habitat. *Objective 1: protect existing wildlife habitat and improve 500,000 acres of critical habitats and watersheds throughout the state. *Objective 3: conserve sensitive species to prevent them from becoming listed as threatened or endangered. *Constituency Goal: Achieve broad-based support for Division programs and budgets by demonstrating the value of wildlife to all citizens of Utah. *Objective 2: improve communication with wildlife organizations, public officials, private landowners, and government agencies to obtain support for Division programs. *UDWR SR critical big game winter range are important browse communities that need to be enhanced and improved. The Division will employ a variety of methods to achieve this including prescribed grazing, prescribed burning, reseeding and seedling transplants, also mechanical treatments. Priority areas will include sagebrush-steppe and mountain browse communities. Falls within the rangeland focus area for WRI wildlife species for mule deer and elk. Utah Wildlife Action Plan, 2015 Publication Number 15-14, State of Utah, Department of Natural Resources, Division of Wildlife Resources, Effective 2015-2025 -- Promoting and funding restoration that reduces the uncharacteristic and surpluses of older age class, including: Dixie/chain harrow, brush mowing or other treatments that reduce the older age class and stimulate the younger/mid age classes; herbicide or mechanical treatments single tree mulching/cutting of invading conifer. Utah Division of Wildlife Resources Statewide Management Plan for Mule deer. Section IV Statewide management goals and objectives. This plan will address Habitat Objective 2: Improve the quality and quantity of vegetation for mule deer on a minimum of 500,000 acres of crucial range by 2013 (p11-12). Strategy C. Initiate broad scale vegetative treatment projects to improve mule deer habitat with emphasis on drought or fire damaged sagebrush winter ranges, ranges that are being taken over by invasive annual grass species, and ranges being diminished by encroachment of conifers into sagebrush or aspen habitats. Strategy f. Encourage land managers to manage portions of pinion-juniper woodlands and aspen/conifer forests in early successional stages. Fillmore Pahvant Deer Herd Management Plan Unit #21 (2015) - Habitat Management Objectives -- Encourage vegetation manipulation projects and seeding to increase the availability, abundance, and nutritional content of browse, grass, and forb species. Strategies: Habitat Protection, Improvement and Maintenance - Reduce expansion of Pinyon-Juniper woodlands into sagebrush habitats and improve habitats dominated by Pinyon-Juniper woodlands by completing habitat restoration projects like lop & scatter, bullhog and chaining projects; maintain summer fawning areas by increasing beneficial habitat work in summer and transitional habitat areas.(p3-4) Utah Wild Turkey Management Plan Newly treated areas through fire or mechanical means will attract use by wild turkey which are abundant on Oak Creek Management Unit. Insects and new growth will be readily available to support turkey populations, also the availability of more water in the John Williams and Long Canyon areas. UDWR Wildlife Action Plan This project is geared toward meeting the goals found within this plan for a variety of wildlife species from large to small. The entire proposed project area is found within a UWRI conservation focus area. *This plan is consistent with the Fishlake National Forest Plan for wildlife habitat enhancement and fuels management to improve habitat, reduce fuel loading, and protect against catastrophic wildfire. *Other project have been completed by the Forest Service and UDWR in past years within the Long Canyon HUC 12 area. *Project within the are also benefit the management plans objectives of the lower Sevier River Watershed, as this will reduced sediment run off and create a healthy rangeland communities. *Management Plans are also in conjunction with NRCS overall goals of healthy rangelands and communities, improving watersheds and reducing erosion and sediment. The Natural Resources Conservation Service provides leadership in a partnership effort to help people conserve, maintain, and improve our natural resources and environment *FFSL CWPP Process is a local Community Wildfire Protection Plan (CWPP) is a collaborative plan created by the fire department, state and local forestry, land managers, community leaders, and the public.The planning process maps values at risk, and requires actions to reduce risk, such as prescribed burning, fuel reduction, or other measures that adapt a community to better confront their wildfire threat. Area is also part of the Millard RWPP FFSL Plan which was implemented in 2014, there are Wildfire Codes and Ordinances associated with this plan. Project would also be relevant to NCS Goals and supported through the FS National Cohesive Strategies. CAT FIRE Objectives and Strategies: In 2013, the State of Utah developed the Catastrophic Wildfire Reduction Strategy (CAT FIRE) in response to the severe 2012 fire season. Reducing the catastrophic wildfire requires attention to three interdependent goals identified in the National Cohesive Wildfire Management Strategy -- Restore and Maintain Landscapes, Fire Adapted Communities, and Wildfire Response. These goals have been embraced throughout the development of the state's CAT FIRE strategy. Mitigation of hazardous fuels can change fire behavior making it easier to suppress. The effects of the mitigation, however, are not limited to life and property safety but will also affect forest health, water quality, vegetative species abundance, etc. As we continue to implement projects across the landscapes in Utah, the only way to truly be successful is to integrate existing programs, utilize local and federal partners and continue to educate the general public to create the desired shift towards more resilient communities and ecosystems.
List management plans where this project will address an objective or strategy in the plan. Describe how the project area overlaps the objective or strategy in the plan and the relevance of the project to the successful implementation of those plans. It is best to provide this information in a list format with the description immediately following the plan objective or strategy.
*
Fire/Fuels
This project was in association with a human cause incident, fuels are removed from the area and the project will be drill seeded along with a late flight shrub seeding allowing for grasses/forbs and shrubs to be planted within the burned area.
If applicable, detail how the proposed project will significantly reduce the risk of fuel loading and/or continuity of hazardous fuels including the use of fire-wise species in re-seeding operations. Describe the value of any features being protected by reducing the risk of fire. Values may include; communities at risk, permanent infrastructure, municipal watersheds, campgrounds, critical wildlife habitat, etc. Include the size of the area where fuels are being reduced and the distance from the feature(s) at risk.
*
Water Quality/Quantity
Water quality and quantity will be a factor within this project, we should see a decline in the water quality and quantity due to the loss forage from the fire, but in the future due to the restoration efforts of the FFO BLM improvements within the burn will be forth coming. Reseeding of grasses/forbs and shrubs within the project site will allow for additional water to be utilized by the perennial grass species when established. Over land erosion should be stabilized through the drill and aerial seeding treatments.
Describe how the project has the potential to improve water quality and/or increase water quantity, both over the short and long term. Address run-off, erosion, soil infiltration, and flooding, if applicable.
*
Compliance
All Culture Resource Inventories will be conducted by the Fillmore BLM Office and should be completed by the middle of next week. Consultation with SHPO will be between the Fillmore BLM and SHPO.
Description of efforts, both completed and planned, to bring the proposed action into compliance with any and all cultural resource, NEPA, ESA, etc. requirements. If compliance is not required enter "not applicable" and explain why not it is not required.
*
Methods
This Project will consist of drill seeding approximately 501 acres of BLM property within the Cottonwood Trail Fire. This will be done by renting a tracked tractor due to the nature of greasewood being present. The seed will be drilled into the soil using a rangeland drill, seed mix is suitable for the soil type and landscape of the project. In the late fall/winter months an aerial flight of shrubs will be applied to provide a diversity to the seed mix.
Describe the actions, activities, tasks to be implemented as part of the proposed project; how these activities will be carried out, equipment to be used, when, and by whom.
*
Monitoring
The FFO BLM West Desert will be monitoring this project for the next five years, looking at noxious weed issues, establishment of seeding and the effects of the drill seeding aspect of the treatment. The BLM will continue to take photo points and collect rangeland data to adhere to the ESR plan that was approved.
Describe plans to monitor for project success and achievement of stated objectives. Include details on type of monitoring (vegetation, wildlife, etc.), schedule, assignments and how the results of these monitoring efforts will be reported and/or uploaded to this project page. If needed, upload detailed plans in the "attachments" section.
*
Partners
Partners on this project will consist of the Fillmore BLM Office and the Utah Division of Wildlife Resources to help rehab the Cottonwood Trail Fire Rehab Project.
List any and all partners (agencies, organizations, NGO's, private landowners) that support the proposal and/or have been contacted and included in the planning and design of the proposed project. Describe efforts to gather input and include these agencies, landowners, permitees, sportsman groups, researchers, etc. that may be interested/affected by the proposed project. Partners do not have to provide funding or in-kind services to a project to be listed.
*
Future Management
Future management of the Cottonwood Trail Fire Rehab Project will be determined by the West Desert BLM Fillmore Office, additional monitoring post fire will be done, increased determination to conduct inventory for noxious weed species will be conducted especially for cheatgrass, squarrose knapweed and Scotch Thistle. The BLM will follow-up with herbicide treatment for the noxious weed species, address future grazing issues and overall rangeland health.
Detail future methods or techniques (including administrative actions) that will be implemented to help in accomplishing the stated objectives and to insure the long term success/stability of the proposed project. This may include: post-treatment grazing rest and/or management plans/changes, wildlife herd/species management plan changes, ranch plans, conservation easements or other permanent protection plans, resource management plans, forest plans, etc.
*
Sustainable Uses of Natural Resources
BLM will deffer livestock grazing in association with the Cottonwood Trail Fire of 2017. In addition a protection fence will be constructed within the Cottonwood Trail Fire Scar and the Oak City Allotment to help with future grazing methods when the seeding becomes established. When grazing is allowed back on the site after two growing seasons it will be monitored by the Range Conservationist from the BLM and the permittee.
Potential for the proposed action to improve quality or quantity of sustainable uses such as grazing, timber harvest, biomass utilization, recreation, etc. Grazing improvements may include actions to improve forage availability and/or distribution of livestock.
Title Page