Ogden Bay WMA Upland/Wetland enhancement FY23
Region: Northern
ID: 6029
Project Status: Completed
Map This Project
Export Project Data
Project Details
*
Need for Project
To improve upland and waterfowl habitat at Ogden Bay WMA /Howard Slough WMA/ Harold Crane WMA funding is needed to do the following: 1. Improve over-winter survival of upland game birds by growing food plots in various locations within the WMA. 2. Promote woody cover and forage production by planting, developing, restoring, and maintaining shelter belts. 3. Control noxious weeds and encourage productive, beneficial vegetation. 4. Develop dense nesting cover on islands and uplands. 5.Manage water levels to maximize wildlife production and forage in wetland environments. 6. Maintain equipment to do all of the above. 7. Repair or reconstruct failed/failing water control structures. 8. Lease 2 tractors each for a 6 month period to accomplish all of the above. The wildlife technician positions allow for the maintenance of existing habitat and the enhancement and development of additional habitat for these WMA's. With the increased pressure from an expanding human population, development of lands, changes in agricultural practices and increased recreational demands it is imperative to maximize the benefits on the areas for wildlife. Technicians will assist the only two full-time employees at OBWMA/HCWMA/HSWMA by completing necessary habitat improvement projects such as noxious weed control, phragmites control projects. Habitat technicians will be responsible for dike mowing and general maintenance on the WMAs. They will also assist in keeping W.I.M.S. updated, various seeding/planting, habitat improvement projects. Technicians will play a key role in banding projects and predator control on the WMA's.
Provide evidence about the nature of the problem and the need to address it. Identify the significance of the problem using a variety of data sources. For example, if a habitat restoration project is being proposed to benefit greater sage-grouse, describe the existing plant community characteristics that limit habitat value for greater sage-grouse and identify the changes needed for habitat improvement.
*
Objectives
An additional 30 acres of food plots will be planted for waterfowl and pheasants at OBWMA/HSWMA/HCWMA. This will improve over-winter survival of upland birds and create quality green forage in the spring for waterfowl. The food plots also provide high quality nesting habitat for pheasants, quail and ducks the following spring. Noxious weeds will be controlled with herbicides and water control techniques to maximize the quality of wildlife habitat. Opportunities will continue to be explored to plant some shelter belts in key areas to benefit our pheasant and quail population. Dense nesting cover will be produced in uplands with native seed mixes. Equipment will be maintained to accomplish all of the above. Tractors will be leased to accomplish mowing, disking, planting. Technicians will assist with treating around 3,000 acres of Phragmites during the fall Phragmites project. During the spring and early summer, technicians will assist in treating around 500 acres of other noxious weeds such as: hoary cress, perennial pepperweed, Dyer's woad, poison hemlock, purple loostrife, salt cedar and various thistle species. Technicians will also assist with upland nesting habitat enhancements, and ground preparation for fall food plots. Water management is essential on the wetlands to enhance our vegetation diversity. Different areas will be monitored that will either be flooded or drought stressed. This task includes monitoring over 300 water control structures that require cleaning and maintenance. Technicians will be aiding managers in banding waterfowl as well as upland releases and relocation projects. The technician will also help us with our UDWR mandated W.I.M.S. system that tracks facilities maintenance. Finally, the technician will assist with predator control.
Provide an overall goal for the project and then provide clear, specific and measurable objectives (outcomes) to be accomplished by the proposed actions. If possible, tie to one or more of the public benefits UWRI is providing.
*
Project Location/Timing Justification (Why Here? Why Now?)
There are currently noxious weeds on all of the uplands that need to be controlled. Once the noxious weeds are sprayed and controlled, there is potential in many areas to seed with beneficial upland seed mix to provide cover for both nesting upland birds and waterfowl. Managing water levels with fully functional water control structures will make the area much more productive. Some of this money could go towards fixing or improving water control structures. Because if water control structures fail, there is a major threat of Phragmites and cattail encroachment. When dealing with farming equipment there is always a physical risk if employees are not cautious in operating equipment. However, technicians will be trained in the use and safety of all equipment. There is also a threat when working around water. Proper precautions and training will also be implemented when working around water.
LOCATION: Justify the proposed location of this project over other areas, include publicly scrutinized planning/recovery documents that list this area as a priority, remote sensing modeling that show this area is a good candidate for restoration, wildlife migration information and other data that help justify this project's location.
TIMING: Justify why this project should be implemented at this time. For example, Is the project area at risk of crossing an ecological or other threshold wherein future restoration would become more difficult, cost prohibitive, or even impossible.
*
Relation to Management Plans
The proposed project meets the objectives in our Habitat management plans. Also the proposed project meets objectives in the WAP such as: Other Ecosystem Modifications Objective #2 for Other Ecosystem Modifications Land management agencies and agents develop vegetation management projects that avoid, minimize, or mitigate impacts to species and habitats identified as vulnerable to these threats such as brush eradication. Habitat modification and loss is being mitigated by perennial plantings, food plots and shrub rows. Objective #1 for Sediment Transport Imbalance Opportunities are found and taken, to modify or remove reservoir infrastructure, or modify outflow management, to simulate or return natural sediment transport. The continual build-up of sediments in GSL wetlands is a major problem that can lead to decreased open water areas, shallower water depths that do not maximize the production of submerged aquatic vegetation, and promotes invasive plant species. The WMA's management relies on water control structures that can be used to help pass through unwanted sediments and maintain a highly diverse and functional wetland. Objective #1 for Droughts Terrestrial SGCNs and key habitats persist on the landscape, despite increasing drought conditions. Drought condition over that past several years has reduced the resilience of highly functional upland habitats. In order to maintain, and rehabilitate these upland habitats, renovation and reseeding is necessary in order to minimize the impacts of drought. Actions that this project will address include; 2.3.14 Conduct upland vegetation treatments to restore characteristic upland vegetation, and reduce uncharacteristic fuel types and loadings. 3.3.1 Develop list of priority reintroduction species and locations Objective #2 for Droughts Aquatic SGCNs and key habitats persist on the landscape, despite increasing drought conditions. Drought conditions over the past several years has made it imperative that the WMA's have properly functioning water control structures to maximize water deliveries in order to maintain key wetland habitats. Actions that this project will address include; 2.3.6 Restore aquatic habitat complexity 2.3.15 Conduct riparian vegetation treatments to restore characteristic riparian vegetation, and reduce uncharacteristic fuel types and loadings.
List management plans where this project will address an objective or strategy in the plan. Describe how the project area overlaps the objective or strategy in the plan and the relevance of the project to the successful implementation of those plans. It is best to provide this information in a list format with the description immediately following the plan objective or strategy.
*
Fire/Fuels
N/A
If applicable, detail how the proposed project will significantly reduce the risk of fuel loading and/or continuity of hazardous fuels including the use of fire-wise species in re-seeding operations. Describe the value of any features being protected by reducing the risk of fire. Values may include; communities at risk, permanent infrastructure, municipal watersheds, campgrounds, critical wildlife habitat, etc. Include the size of the area where fuels are being reduced and the distance from the feature(s) at risk.
*
Water Quality/Quantity
Water quantity and impoundment levels will be monitored daily.
Describe how the project has the potential to improve water quality and/or increase water quantity, both over the short and long term. Address run-off, erosion, soil infiltration, and flooding, if applicable.
*
Compliance
All areas that the soil will be disturbed in areas that it hasn't been disturbed will be coordinated with the archaeologist.
Description of efforts, both completed and planned, to bring the proposed action into compliance with any and all cultural resource, NEPA, ESA, etc. requirements. If compliance is not required enter "not applicable" and explain why not it is not required.
*
Methods
This is a fairly broad project and could consist of many methods for completion of various projects. For example, areas may be mowed, disked, and then planted to create new food-plots or shelter-belts for waterfowl or upland game birds. New and existing food-plots, will be sprayed to control noxious weeds. Also, noxious weeds will be sprayed at the appropriate time each year so that the maximum kill per species is achieved. Before planting shelter-belts, the most productive woody species will be determined by assessing which species have the best chance of survival within the soil types that are present at OBWMA/HSWMA/HCWMA. Woody species will be planted in areas that are close to a water source so that shelter-belts can be watered. Upland nesting cover plantings will also occur. Soil samples will be taken on all areas and soil amendments will be added to give everything that is planted the best opportunity to succeed. Repair of eroding dikes may be a necessary addition to this project. Water control structures will also be constructed to replace failed structures. Technicians will assist with fall waterfowl bag checks, trash management, water management, predator control, waterfowl banding and dove banding. Technicians will be safely instructed on using a variety of trapping methods, tools and techniques that abide by all state Euthanasia guidelines to decrease predators and promote desired wildlife populations on the WMA's. Technicians will be educated/trained about plant I.D., sprayer use and maintenance, machine use, maintenance and safety while working on the WMA's.
Describe the actions, activities, tasks to be implemented as part of the proposed project; how these activities will be carried out, equipment to be used, when, and by whom.
*
Monitoring
Habitat assessments for Phragmites project success are done with a series of photo-point monitoring, and rapid habitat assessments through vegetation transects on treatment sites. Weed monitoring is done by recording the amount and then acreage of herbicide sprayed. The location and date of herbicide treatments are also recorded. Habitat technicians assist managers with waterfowl population monitoring by completing on-the-ground census. Habitat technicians assist managers with waterfowl harvest monitoring through hunter-bag-checks.
Describe plans to monitor for project success and achievement of stated objectives. Include details on type of monitoring (vegetation, wildlife, etc.), schedule, assignments and how the results of these monitoring efforts will be reported and/or uploaded to this project page. If needed, upload detailed plans in the "attachments" section.
*
Partners
Partners will be the volunteers that will be used on volunteer projects used to accomplish some of these projects. SFW
List any and all partners (agencies, organizations, NGO's, private landowners) that support the proposal and/or have been contacted and included in the planning and design of the proposed project. Describe efforts to gather input and include these agencies, landowners, permitees, sportsman groups, researchers, etc. that may be interested/affected by the proposed project. Partners do not have to provide funding or in-kind services to a project to be listed.
*
Future Management
The projects will be maintained in the future. All shrub rows will be irrigated until it is thought the plants can survive on their own. Any areas that are sprayed will be revisited in the future and sprayed when necessary.
Detail future methods or techniques (including administrative actions) that will be implemented to help in accomplishing the stated objectives and to insure the long term success/stability of the proposed project. This may include: post-treatment grazing rest and/or management plans/changes, wildlife herd/species management plan changes, ranch plans, conservation easements or other permanent protection plans, resource management plans, forest plans, etc.
*
Sustainable Uses of Natural Resources
Cattle may be used in areas that Phragmites is growing and water management and herbicide treatments are failing.
Potential for the proposed action to improve quality or quantity of sustainable uses such as grazing, timber harvest, biomass utilization, recreation, etc. Grazing improvements may include actions to improve forage availability and/or distribution of livestock.