Utah Motus Network: Phase II Build-out
Region: Statewide
ID: 7206
Project Status: Completed
Map This Project
Export Project Data
Project Details
*
Need for Project
The greatest impediment for managers of migratory small-bodied SGCNs, which comprise the vast majority of Utah's SGCN birds, has been the lack of decent data on migration pathways, timing, duration, and wintering areas. We just don't know what threats our birds face the other 9 months of the year. Being able to answer these questions about migratory species is crucial for their conservation, and for identifying high-value conservation sites. But migratory life stages are nearly unstudied since traditional GPS telemetry is far too heavy for most birds to carry and too expensive to deploy in meaningful numbers. However, a new system for tracking movements and survival of migratory animals is the Motus radio telemetry receiver network (motus.org). This network is an international collaborative that successfully identifies stopover site duration, connected migratory routes, post-fledging dispersal and survival, and adult survival and fidelity on a landscape-scale; parameters that cannot be easily estimated using non-tagged birds. While the Motus network is highly connected in the eastern United States, the western interior is seriously lagging in coverage and connectivity, limiting the ability to obtain sample sizes large enough to robustly model demographic parameters from tagged birds. The expansion of the Motus network has been identified by state agencies in the Pacific Flyway Council and in Western Association of Fish and Wildlife Agencies (WAFWA) as a high priority, to benefit game and non-game species alike.
Provide evidence about the nature of the problem and the need to address it. Identify the significance of the problem using a variety of data sources. For example, if a habitat restoration project is being proposed to benefit greater sage-grouse, describe the existing plant community characteristics that limit habitat value for greater sage-grouse and identify the changes needed for habitat improvement.
*
Objectives
Phase II: The UDWR will: 1) work with the Utah Motus Working Group to identify and prioritize approximately 20 additional strategic locations for Motus station installations; 2) grant Tracy Aviary up to $100,000.00 to assist with the Motus Station Installation Project; 3) only agree to costs for installation of Motus stations approved by the Utah Motus Working group; and 4) assist with entering the project and completion reports through the Watershed Restoration Initiative (WRI) site as needed. The Tracy Aviary will: 1) use these funds for costs associated with the Motus Station Installation Project proposed through the UPCD Watershed Restoration Initiative, and only at locations specified by the Utah Motus Working Group; 2) complete project activities by June 30, 2026; and 3) oversee project implementation and work with the project managers to submit a completion report in the WRI online database within 3 months of completion of the project or by June 30, 2026.
Provide an overall goal for the project and then provide clear, specific and measurable objectives (outcomes) to be accomplished by the proposed actions. If possible, tie to one or more of the public benefits UWRI is providing.
*
Project Location/Timing Justification (Why Here? Why Now?)
Its is critical to build out the Utah Motus network in coordination with manager and researchers already deploying Motus tags on SGCNs, and in close coordination with other western states in our Flyway who have also made major commitments and investments in recent years.
LOCATION: Justify the proposed location of this project over other areas, include publicly scrutinized planning/recovery documents that list this area as a priority, remote sensing modeling that show this area is a good candidate for restoration, wildlife migration information and other data that help justify this project's location.
TIMING: Justify why this project should be implemented at this time. For example, Is the project area at risk of crossing an ecological or other threshold wherein future restoration would become more difficult, cost prohibitive, or even impossible.
*
Relation to Management Plans
Utah's Wildlife Action Plan, virtually all Federal Agency Management plans.
List management plans where this project will address an objective or strategy in the plan. Describe how the project area overlaps the objective or strategy in the plan and the relevance of the project to the successful implementation of those plans. It is best to provide this information in a list format with the description immediately following the plan objective or strategy.
*
Fire/Fuels
N/A
If applicable, detail how the proposed project will significantly reduce the risk of fuel loading and/or continuity of hazardous fuels including the use of fire-wise species in re-seeding operations. Describe the value of any features being protected by reducing the risk of fire. Values may include; communities at risk, permanent infrastructure, municipal watersheds, campgrounds, critical wildlife habitat, etc. Include the size of the area where fuels are being reduced and the distance from the feature(s) at risk.
*
Water Quality/Quantity
N/A
Describe how the project has the potential to improve water quality and/or increase water quantity, both over the short and long term. Address run-off, erosion, soil infiltration, and flooding, if applicable.
*
Compliance
This varies with location. The UDWR and Tracy Aviary work directly with landowners and land managers at the specific locations to pursue the required NEPA (e.g., with the BLM for a station at Rozel Point), MOU's (e.g., with Utah State Parks to install stations on existing Parks infrastructure), and federal facilities management plan requirements (e.g. electrical and building inspections were required at Bear River Migratory Bird Refuge).
Description of efforts, both completed and planned, to bring the proposed action into compliance with any and all cultural resource, NEPA, ESA, etc. requirements. If compliance is not required enter "not applicable" and explain why not it is not required.
*
Methods
Installation methods will necessarily vary with installation location, facility owner/operator requirements, connection to grid power and internet, etc. For example, Phase I stations have utilized existing infrastructure such as roof tops and radio masts whenever possible, but have also (donated from Pacific Power) installed dedicated telephone poles, free-standing radio masts, and fully remote solar-powered and cell-connected stations (e.g., on Gunnison Island)
Describe the actions, activities, tasks to be implemented as part of the proposed project; how these activities will be carried out, equipment to be used, when, and by whom.
*
Monitoring
N/A
Describe plans to monitor for project success and achievement of stated objectives. Include details on type of monitoring (vegetation, wildlife, etc.), schedule, assignments and how the results of these monitoring efforts will be reported and/or uploaded to this project page. If needed, upload detailed plans in the "attachments" section.
*
Partners
The Tracy Aviary
List any and all partners (agencies, organizations, NGO's, private landowners) that support the proposal and/or have been contacted and included in the planning and design of the proposed project. Describe efforts to gather input and include these agencies, landowners, permitees, sportsman groups, researchers, etc. that may be interested/affected by the proposed project. Partners do not have to provide funding or in-kind services to a project to be listed.
*
Future Management
Information on occupancy and abundance of species of concern during migration is the foundation for game and non-game bird species conservation and management (Fink et al. 2020). The data collected here can be used to understand the spatial and temporal migratory connectivity of populations during migration, can help identify bottlenecks that are affecting breeding populations, identify stopover duration and locations, create the specific demographic estimates of adult and juvenile migration and stopover survival that are required to identify and conserve climate resilient high quality stopover sites.
Detail future methods or techniques (including administrative actions) that will be implemented to help in accomplishing the stated objectives and to insure the long term success/stability of the proposed project. This may include: post-treatment grazing rest and/or management plans/changes, wildlife herd/species management plan changes, ranch plans, conservation easements or other permanent protection plans, resource management plans, forest plans, etc.
*
Sustainable Uses of Natural Resources
N/A
Potential for the proposed action to improve quality or quantity of sustainable uses such as grazing, timber harvest, biomass utilization, recreation, etc. Grazing improvements may include actions to improve forage availability and/or distribution of livestock.
Title Page
Project Details
Finance
Species
Habitats
Seed
Comments
Images/Documents
Completion Form
Project Summary Report