Project Status: Current
Map This Project
Export Project Data
Project Details
*
Need for Project
Laketown creek currently has problems with water quality, water quantity, degraded habitat, and fish passage. There is a UTV road that runs up Laketown Canyon and crosses the stream in multiple locations. Four of these crossings are on BLM land and there is erosion which has resulted in the stream running down the road. These crossings were hardened in 2020 by Trout Unlimited, but recent high flows and increased traffic have degraded the crossings. Project leads will need to discuss more durable ways to protect these crossings. The erosion and sedimentation has resulted in loss of water for the irrigation company as well as increased sediment. Bonneville Cutthroat Trout habitat is also degraded from the increase in find sediment.
Provide evidence about the nature of the problem and the need to address it. Identify the significance of the problem using a variety of data sources. For example, if a habitat restoration project is being proposed to benefit greater sage-grouse, describe the existing plant community characteristics that limit habitat value for greater sage-grouse and identify the changes needed for habitat improvement.
*
Objectives
1. Improve four stream crossings to keep the stream in the channel and out of the road. 2. Decrease sedimentation to improve water quality and stream habitat. 3. Maintain recreational opportunities and wildland fire access by improving road access. 4. These improvements will be done in conjunction with other projects designed to create more complex habitat and perennial stream flow through use of low-tech process based restoration.
Provide an overall goal for the project and then provide clear, specific and measurable objectives (outcomes) to be accomplished by the proposed actions. If possible, tie to one or more of the public benefits UWRI is providing.
*
Project Location/Timing Justification (Why Here? Why Now?)
In Laketown Creek, road damage from the current stream crossings will continue to increase without maintenance and will result in a decrease in water quality which directly impacts the BCT and residents of Laketown.
LOCATION: Justify the proposed location of this project over other areas, include publicly scrutinized planning/recovery documents that list this area as a priority, remote sensing modeling that show this area is a good candidate for restoration, wildlife migration information and other data that help justify this project's location.
TIMING: Justify why this project should be implemented at this time. For example, Is the project area at risk of crossing an ecological or other threshold wherein future restoration would become more difficult, cost prohibitive, or even impossible.
*
Relation to Management Plans
1. Bonneville Cutthroat Trout Range-wide Conservation Agreement and Strategy (2019): --This project meets the following recommended conservation actions to: 1) Expand BCT populations and distribution...2) Enhance and maintain habitat. -- Meets goals to manage for adfluvial (migratory populations connected to lakes) in the Bear River geographic management unit (GMU) and maintain all populations within the GMU 2. Utah Wildlife Action Plan (2015) -- Bonneville cutthroat trout are a N4 priority species. -- Key Habitats for Species of Greatest Conservation Need include Riverine and Aquatic Scrub-shrub. 3. UDWR Strategic Plan: this project will help the UDWR meet its Resource Goal, which is to "expand wildlife populations and conserve sensitive species by protecting and improving wildlife habitat. This project will specifically address objectives 2 and 3 of the UDWR Resource Goal, which are to (1) "increase fish and game populations to meet management plan objectives and expand quality fishing and hunting opportunities," and to (2) "conserve sensitive species to prevent them from becoming listed as threatened or endangered." 4. UDWR Bear Lake Management Plan (hydrologic unit 16010201): Identifies dewatering as a major resource issue and a solution of working with irrigators to allow minimum stream flows, especially during cutthroat trout spawning in the spring and egg incubation in the summer. Erosion is also cited as an issue, along with a solution to continue to work with landowners and managers to improve erosion control. Habitat enhancement and maintenance is also specified for cutthroat trout in the plan. 5. Bear Lake Fisheries Management Plan (Utah and Idaho; 2010): The central management objectives of this plan are to: 1) conserve natives species, and 2) enhance sport fishing opportunities in Bear Lake. Both of these objectives will be addressed by this project. Specific management goals for Bonneville Cutthroat Trout include: maintain a viable adfluvial population and a sport fishery. This project will reestablish an adfluvial run of cutthroat trout in North Eden Creek, which will increase native trout recruitment to Bear Lake and the sport fishery. 6. Randolph Management Framework Plan (BLM 1980) -- Designate Laketown Area Critical Environmental Concern (ACEC) for purposes of maintaining high water quality and fisheries habitat. 7. Laketown Canyon ACEC (BLM 1989) -- Maintain water quality in Laketown Canyon -- Improve quality of aquatic and riparian habitat -- Maintain recreational opportunities
List management plans where this project will address an objective or strategy in the plan. Describe how the project area overlaps the objective or strategy in the plan and the relevance of the project to the successful implementation of those plans. It is best to provide this information in a list format with the description immediately following the plan objective or strategy.
*
Fire/Fuels
Maintaining adequate water supply to the Laketown Reservoir and irrigation company will help provide water for wildfire suppression needs.
If applicable, detail how the proposed project will significantly reduce the risk of fuel loading and/or continuity of hazardous fuels including the use of fire-wise species in re-seeding operations. Describe the value of any features being protected by reducing the risk of fire. Values may include; communities at risk, permanent infrastructure, municipal watersheds, campgrounds, critical wildlife habitat, etc. Include the size of the area where fuels are being reduced and the distance from the feature(s) at risk.
*
Water Quality/Quantity
On Laketown Creek, the intent of this project is to improve water quantity and quality by keeping water in the stream channel and off the road surface. This project will increase water quantity by reducing evaporation and infiltration from the road bed. It will improve water quality by decreasing fine sediment and reducing the risk of contamination from the road such as oil and gasoline spills and leaks.
Describe how the project has the potential to improve water quality and/or increase water quantity, both over the short and long term. Address run-off, erosion, soil infiltration, and flooding, if applicable.
*
Compliance
BLM will comply with all NEPA principles throughout the project. Coordination with the Division of Water rights and City of Laketown will also take place when necessary.
Description of efforts, both completed and planned, to bring the proposed action into compliance with any and all cultural resource, NEPA, ESA, etc. requirements. If compliance is not required enter "not applicable" and explain why not it is not required.
*
Methods
All four Laketown Creek road crossings will be improved to reduce erosion, improve stream habitat, and maintain the travel way. Topographic surveys will be completed at all three sites, including stream longitudinal profiles and cross sections along with the extent and elevations along the travel ways. Survey data will be used to identify the best crossing alternatives for each site, whether that would be hardening of the fords (and type of materials used) or culverts. A construction contractor will be hired to install the fords or culverts during late summer or autumn.
Describe the actions, activities, tasks to be implemented as part of the proposed project; how these activities will be carried out, equipment to be used, when, and by whom.
*
Monitoring
-- Annual inspection will be completed of the stream crossings to ensure they are working as planned. -- Annual water quality monitoring -- Aquatic AIM monitoring to evaluate changes in instream habitat will occur approximately every 5 years -- Irrigation company will notify of any changes or issues with their water supply that may be a result of this project.
Describe plans to monitor for project success and achievement of stated objectives. Include details on type of monitoring (vegetation, wildlife, etc.), schedule, assignments and how the results of these monitoring efforts will be reported and/or uploaded to this project page. If needed, upload detailed plans in the "attachments" section.
*
Partners
-Trout Unlimited -UDWR
List any and all partners (agencies, organizations, NGO's, private landowners) that support the proposal and/or have been contacted and included in the planning and design of the proposed project. Describe efforts to gather input and include these agencies, landowners, permitees, sportsman groups, researchers, etc. that may be interested/affected by the proposed project. Partners do not have to provide funding or in-kind services to a project to be listed.
*
Future Management
In Laketown Creek, BLM will continue to follow the Laketown Canyon ACEC plan and manage the resource according to that plan. This project will improve water quality and quantity, riparian habitat, and Bonneville cutthroat trout habitat and not impact other resource values of the area such as grazing and recreation.
Detail future methods or techniques (including administrative actions) that will be implemented to help in accomplishing the stated objectives and to insure the long term success/stability of the proposed project. This may include: post-treatment grazing rest and/or management plans/changes, wildlife herd/species management plan changes, ranch plans, conservation easements or other permanent protection plans, resource management plans, forest plans, etc.
*
Sustainable Uses of Natural Resources
Improving the road crossings on Laketown Creek will sustain and improve access for recreational use and grazing management, as well as improve access for wildland fire response.
Potential for the proposed action to improve quality or quantity of sustainable uses such as grazing, timber harvest, biomass utilization, recreation, etc. Grazing improvements may include actions to improve forage availability and/or distribution of livestock.
Title Page
Project Details
Finance
Species
Habitats
Seed
Comments
Images/Documents
Completion Form
Project Summary Report