skip to main content
Utah.gov
Visit Utah.gov
Services
Agencies
Search Utah.gov
Department of Natural Resources
DNR
Settings
Settings
Skip to Content
Main Menu
Search
Utah's Watershed Restoration Initiative
Utah's Watershed Restoration Initiative
Projects
Maps
About Us
Register
Login
Search
Search By Project Id/Name
Search
Search
Saving...
Thank you for requesting access to WRI.
An administrator will contact you with further details.
Cedar Springs, Flaming Gorge Reservoir Fishing Pier and Wildlife Viewing Area
Region: Northeastern
ID: 6881
Project Status: Current
Map This Project
Export Project Data
Title Page
*
Title
Choose a name that is unique to the project. If it is a multi-year project, identify the year (1, 2, etc.), fiscal year (FY17, FY18, etc.), or phase (1, 2, etc.). Be as descriptive as possible, titles may include descriptive words that indicate; location, species benefiting, treatment technique , etc. Don't use any abbreviations, symbols or non-descriptive terms such as, "project" or "Restoration" or "Enhancement" or "completion". Don't include any landowner/citizens' first or last names.
*
Short Description of Project
Procure an ADA accessible fishing pier/wildlife viewing structure constructed of 166 feet of 100-inch wide EZ Dock (rotomolded interlocking plastic dock) which will include guardrails, rod holders, and benches.
A brief summary of the project. Identify the output (e.g. Improve 500 acres of deer winter range by chaining and seeding a pinyon-juniper woodland), not the expected outcome (e.g. Increase carrying capacity of deer winter range).
*
Short Description of Project Location
The fishing pier will be connected to a 500 feet long floating trail (pending 2024 Boater Access Proposal) located at Cedar Springs Marina (marina) on Flaming Gorge Reservoir, UT. This facility will be connected to shore near Cedar Springs public boat ramp on one end and the marina on the other end. The marina is located approximately 1 mile west of Flaming Gorge Dam at 40.54'43.3" N 109.53.5" W.
Provide general location information. For example, "Five miles east of Sterling on the Manti-LaSal National Forest" or "A one-mile section of the East Fork Sevier River, five miles downstream of Otter Creek Reservoir."
*
Project Manager
Ryan Mosley
* Project Manager
* Project Manager
Project ID
6881
*
UWRI Region
Northeastern
* UWRI Region
* UWRI Region
The Utah Watershed Restoration Initiative Region in which the project will take place. Regions can be viewed by enabling the UWRI Regions layer on the map page.
*
Lead Agency or Organization
Utah Division of Wildlife Resources
* Lead Agency or Organization
* Lead Agency or Organization
Identify the agency or organization that will be responsible for the majority of project implementation.
*
Fiscal Year of Implementation
2025
* Fiscal Year of Implementation
* Fiscal Year of Implementation
Select the fiscal year (FY) in which the project manager would like to implement the project. The UWRI Fiscal year falls between July 1st and June 30th of the following year. For example, fiscal year 2017 is July 1, 2016 - June 30, 2017.
Contributors
Trina Hedrick
Craig Walker
Jordon Detlor
Ryan Mosley
Natalie Boren
Contributors
No matches found
Other registered WRI users who you wish to have Project Manager level read/write access to this proposal.
Funding Category
Blue Ribbon FAC
Habitat Council
Funding Category
No matches found
The administrative/funding program(s) in which your proposal fits best. UWRI refers to Utah Watershed Restoration Initiative. Habitat Council, External Conservation Permit, and Blue Ribbon Council (BRFAC) are Utah Division of Wildlife Resources sponsored programs. If you are unsure of which program your proposal fits, and/or would like to be considered for any and all appropriate sources of funding, select WRI.
Equipment Needed from GBRC
Check this box if you plan to request the use of equipment to implement your project from the UDWR Great Basin Research Center and WRI Equipment Storage/Maintenance Facility. A representative from the facility will contact you when appropriate.
Equipment needed from GBRC
No Map Features
Check this box if your project will not affect a geospatial footprint, or will not create or manipulate a structure (e.g. fence, pipeline, dam, etc.). Otherwise, use the Map This Project button at the top of the page to define the project footprint and actions.
Carry Over
No
Proposal Submission Date
03/27/2024
Title Page
Project Details
Finance
Species
Habitats
Seed
Comments
Images/Documents
Completion Form
Project Summary Report