Wild Sheep Guzzler Maintenance
Region: Statewide
ID: 5835
Project Status: Current
Map This Project
Export Project Data
Project Details
*
Need for Project
The Utah Division of Wildlife Resources installs and maintains guzzlers (man-made water developments) to allow wildlife to utilize habitat that might not otherwise be occupied or functional without additional water. Guzzlers are built to primarily benefit upland and/or big game, but can also benefit other wildlife species and livestock in some cases. In arid Utah, guzzlers can be critical to wildlife especially in years of drought.
Provide evidence about the nature of the problem and the need to address it. Identify the significance of the problem using a variety of data sources. For example, if a habitat restoration project is being proposed to benefit greater sage-grouse, describe the existing plant community characteristics that limit habitat value for greater sage-grouse and identify the changes needed for habitat improvement.
*
Objectives
Supply materials to Utah Wild Sheep Foundation volunteers to maintain guzzlers for bighorn sheep.
Provide an overall goal for the project and then provide clear, specific and measurable objectives (outcomes) to be accomplished by the proposed actions. If possible, tie to one or more of the public benefits UWRI is providing.
*
Project Location/Timing Justification (Why Here? Why Now?)
Failure to maintain water developments may be detrimental to bighorn sheep populations.
LOCATION: Justify the proposed location of this project over other areas, include publicly scrutinized planning/recovery documents that list this area as a priority, remote sensing modeling that show this area is a good candidate for restoration, wildlife migration information and other data that help justify this project's location.
TIMING: Justify why this project should be implemented at this time. For example, Is the project area at risk of crossing an ecological or other threshold wherein future restoration would become more difficult, cost prohibitive, or even impossible.
*
Relation to Management Plans
The Statewide Bighorn Sheep management plan calls to maintain water distribution facilities effectively expanding wildlife distribution to areas where water is the limiting factor for wildlife.
List management plans where this project will address an objective or strategy in the plan. Describe how the project area overlaps the objective or strategy in the plan and the relevance of the project to the successful implementation of those plans. It is best to provide this information in a list format with the description immediately following the plan objective or strategy.
*
Fire/Fuels
N/A
If applicable, detail how the proposed project will significantly reduce the risk of fuel loading and/or continuity of hazardous fuels including the use of fire-wise species in re-seeding operations. Describe the value of any features being protected by reducing the risk of fire. Values may include; communities at risk, permanent infrastructure, municipal watersheds, campgrounds, critical wildlife habitat, etc. Include the size of the area where fuels are being reduced and the distance from the feature(s) at risk.
*
Water Quality/Quantity
Guzzler construction and maintenance provides critical water sources for wildlife throughout the State.
Describe how the project has the potential to improve water quality and/or increase water quantity, both over the short and long term. Address run-off, erosion, soil infiltration, and flooding, if applicable.
*
Compliance
Archaeology, UDWR archaeologist will be contacted prior to undertaking any projects that may or are likely to require clearance. Survey required for project activities having the potential to impact the ground. This project will focus on maintaining existing guzzlers so archeology will usually not be necessary.
Description of efforts, both completed and planned, to bring the proposed action into compliance with any and all cultural resource, NEPA, ESA, etc. requirements. If compliance is not required enter "not applicable" and explain why not it is not required.
*
Methods
Volunteers and regional maintenance personnel will assess guzzler maintenance needs of guzzlers and determine a course of action. The fund from this project will provide materials to guzzlers in need of repair.
Describe the actions, activities, tasks to be implemented as part of the proposed project; how these activities will be carried out, equipment to be used, when, and by whom.
*
Monitoring
Volunteers and regional maintenance personnel will asses the needs of guzzler maintenance and DWR will enter these needs into the guzzler maintenance database.
Describe plans to monitor for project success and achievement of stated objectives. Include details on type of monitoring (vegetation, wildlife, etc.), schedule, assignments and how the results of these monitoring efforts will be reported and/or uploaded to this project page. If needed, upload detailed plans in the "attachments" section.
*
Partners
Utah Wild Sheep Foundation
List any and all partners (agencies, organizations, NGO's, private landowners) that support the proposal and/or have been contacted and included in the planning and design of the proposed project. Describe efforts to gather input and include these agencies, landowners, permitees, sportsman groups, researchers, etc. that may be interested/affected by the proposed project. Partners do not have to provide funding or in-kind services to a project to be listed.
*
Future Management
Continue to improve water distribution for wildlife and livestock.
Detail future methods or techniques (including administrative actions) that will be implemented to help in accomplishing the stated objectives and to insure the long term success/stability of the proposed project. This may include: post-treatment grazing rest and/or management plans/changes, wildlife herd/species management plan changes, ranch plans, conservation easements or other permanent protection plans, resource management plans, forest plans, etc.
*
Sustainable Uses of Natural Resources
N/A
Potential for the proposed action to improve quality or quantity of sustainable uses such as grazing, timber harvest, biomass utilization, recreation, etc. Grazing improvements may include actions to improve forage availability and/or distribution of livestock.